NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 08/NADLER
Document / 109 pages

WTC document preservation notice, NYC Law Department

Machine-extracted title · confidence 95%

Standard administrative notice requiring the retention of original World Trade Center records as evidence for future legal actions.

NYC-WTC_000144741–000144849

Folder label: “NADLER”

Page image
Scanned page image, NYC-WTC_000144753
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

.NAY-20-2002 21:37 U.S. EPftzDEPP 212 6373772 P.03Z11

JUDICIARY COMMirXEE JERROLD NADLER MKMMnsii; St* DawicT. NEW Yc«« •AMOMMCMBCA ea)i,tmun(w MBivTO; •wnwi'n'ATiv;*** U WaShINCTSN ofF1O.S uV aavvurn house asMs smuewG WXSHiNC^N.&CJOSIli TRANSPORTATION ANO (SttilsaMRH infrastructohb committee fcliBOMXITWK: MltNWAVtUAWM** CongTESS of tije IHmteti S)tateS a wrwcTOfFtCE. VA«CltCTS»BT SUITS tM of jREprEfimtatihES NSW WISBW

MOIONAIWW* a 8,fT«ieTQW>lCt Washington, 59C 20515 MtsenUNEAtfENUe commvmtvrqomm: ste^TN, wy nsM PIS) ATS.*! es E.n,«ii; jpTBW.t»ioiWOBUB.I,ii««Mo» W(k)

COMMENTS Of U.S REFRESENTATIYS .12RROLD NADLER (NY-08) EPA SCOPE OF WORK WORLD TRADE CENTER BUILDING REMEDIATION Ashestos Ptoiect ?ZQnitQT tod Air Sampling Cet Et s''”

A. Introduction • The term ‘‘apartment” in the final sentence too restrictive. The term “dwelling ’ should be used to clarify that the Scope of Work applies to all units, such as condoouniums, co-ops, private homes, etc. B. Qualiticatioos Project Monitors should not simply be people widx a NYS Asbestos Project Monitor certificate. There should also be EPA employees on site, such as On*Sccne Coordinators or Project Managers, and they must document all actions taken at the response site. C. Specifications < The Scope of Work implies that Project Monitors will receive information, from the EPA Hotline, schedule appointments, and ensure that cleaa-up activities comply with the Scope of Work. However, Project Monitors will not actually be on-site during clean-up activities. Only Air Monitoring tochnicians are required to be on-sixe. The Scope of Worit makes no mention of anyone from EPA or OSHA being preseut at the site. There must be federal personnel on-site to ensure that all activities comply with die Scope of Work. Compliance must not be confirmed via second-hand infermatioc- Federal personnel at the response scene must enforce it. Tn accordance with OSHA Regulation 29 CPR1926. there mist be a ‘'compstent person” present at the site to eawure the appropriate handling of material, hazards and to ensure worker safety and health. • The EPA must ensure that tire Hotline is staffed will) people who can communicate with all members of the public, including tenants of Chinatown, members of ths Spanish-speaking community, tod all other residents who speak English as a second language. « 3(e) says that "ihc project manager shall advise the occupant or his/her authorized representative on the ^vantages and disadvantages regarding the use of the equipment... [aggressive air testing).” What are the advantages and disadvantages that will be presented to the occupant? Who qualities as an "authorized representative" of

NYC-VVTC_000144753

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000144753Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →