NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 42/E-mails R. Avaltroni 2002
Document / 14 pages

Cleaning and monitoring SOW drafts for review, June 2002

Machine-extracted title · confidence 100%

Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.

NYC-WTC_000161167–000161180

Folder label: “E-mails R. Avaltroni 2002

Page image
Scanned page image, NYC-WTC_000161174
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Indoor Air Residential Assistance Pr Gur. bl Monitoring Contract Scope of Work DRAFT - 6/11/02

AJ]TiUiT-riTetion All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and this Scope of Work, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). This project shall involve scheduling, coordinating and monitoring the clean up of dust/debris and air sampling from building apartments impacted by the attack and collapse of the World Trade Center.

B. Roles and Responsihilitfes The USEPA On-Scene Coordinator (OSC) has overall responsibilityfor insuring that work conducted as part ofthe Indoor Air Residential Assistance Program is completed safely, efficiently and in a compliance with the Scope of Work. As such, the OSC or designee shall have thefollowing authorities relating to work conducted under this contract:

J. The OSC has the authority to stop workfor health and safety reasons orfor non- compliance with the Scope of Work.

2. The OSC has the authority to direct the contractor in the pe/formance ofthe work.

3. The OSC has the authority to review and approve or disapprove ofthe qualifications of all contractor personnel involved in the work.

4. The OSC has the right to inspect and acc^t or refect any work.

[input DEP Roles and Responsibilities for contract officer andproject manager]

C. Qualifications Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring, HVAC and mold expertise.

Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects. The Project Monitor must have access to translation services to conduct

1

NYC-WTC_000161174

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000161174Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →