NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 42/E-mails R. Avaltroni 2002
Document / 14 pages

Cleaning and monitoring SOW drafts for review, June 2002

Machine-extracted title · confidence 100%

Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.

NYC-WTC_000161167–000161180

Folder label: “E-mails R. Avaltroni 2002

Page image
Scanned page image, NYC-WTC_000161175
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

scheduling visits with residents.

Technicians Air monitoring technicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

D. Specifications

Clean up activities shall be scheduled for 20 to 30 units per day. Air sampling shall also be provided at 10 to 20 units where clean up activities are not scheduled. Sufficient personnel shall be available for project monitoring and sampling.

Sampling equipment must be in sufBcient quantity to provide the amount and type of samples required for this project. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.45um. Contractors should be prepared to go to O.Sum filters if 0.45um filters clog.

The contractor shall prepare a Health and Safety Plan (HASP) in accordance with 29 CFR1910.1001 and 29 CFR 1926.58. All personnel involved in residential cleaning and monitoring activities shall follow the contractor Health and Safety Plan (HASP) prepared by their employer. EPA shall be provided with a copy of the employer HASP prior to the start of work. Individuals performing clean up activities may wear personal protective equipment or respirators in accordance with their employer’s health and safety plan. All cleaning operations will be conducted in accordance with the Cleaning Contract Scope of Work.

Copies of all invoices for work conducted under this contract shall be provided to USEPA and DEP.

The Project Monitor shall direct and coordinate all services and report all findings to USEPA. The scope of this project will be as follows:

5. The Project Monitor shall be responsible for accessing a secure EPA Website (url, user name and password to be provided by EPA). In coordination with the USEPA OSC, the Project Monitor will access residential services requested from the Website and schedule clean-up activities and air sampling with the tenants/owners, project monitors, asbestos abatement contractors and air monitoring technicians to the various apartments. The Project Monitor will then supply relevant information on activities back into the EPA Indoor Air database via the secure EPA website. Data to be input may include but is not limited to start and completion datesfor the cleaning, sampling dates and sample identification numbers.

6. The Project Monitor will schedule and conduct pre-cleaning and pre-sampling inspections

2

NYC-WTC_000161175

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000161175Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →