of the apartments, HVAC systems and common spaces. Residents will be provided with
information regarding sampling options (aggressive and modified aggressive sampling
protocols) and the handling of valuable personal items (money, jewelry, heirlooms) during
work. The Project Monitor will obtain written access and authorization to clean the
apartments, heating ventilation and air conditioning (HVAC) systems and common spaces
using the USEPA Access Agreement (to be provided). The Project Monitor will advise EPA
if any of following conditions are observed: mixed residential and commercial use within a
building; dust and/or debris in common spaces; the presence of mold that may pose a hazard
to residents or workers (guidelines to be provided); residents with special needs; or other
circumstances that may require deviation from the procedures specified in Scope of Work.
In consultation with EPA, the Project Monitor will make a determination of the appropriate
Cleaning Contract Scope of Work (i.e. Scope A or B) to be employed. This determination
is to be made based the descriptions included in the Cleaning Contract Scope of Work and
best professionalJudgement.
7. The Monitoring contractor shall evaluate all HVAC systems in all buildings where cleaning
will take place to determine if these systems have been impacted by dust or debris from the
collapse of the World Trade Center and if these systems require cleaning. The Monitoring
Contractor will clean impacted HVAC systems utilizing specialized labor trained and
experienced in duct cleaning. No residential or common space shall be cleaned until the
HVAC system has been evaluated and cleaned in necessary.
8. In the event that mold is observed in a residence during the pre-cleaning inspection, a follow
up inspection will be conducted by a mold expert to determine if the mold poses a health risk
to residents or workers. If the presence of mold is determined to pose a health risk, the
Monitoring Contractor may be required to mitigate the problem using specialized labor
trained and experienced in mold remediation.
9. The Project Monitor shall schedule and oversee the cleaning operations of the Cleaning
Contractor. If DEP has determined that additional exterior clean up is required, no
residential or common space or HVAC system shall be cleaned until the exterior of the
building is cleaned. The Project Monitor shall coordinate daily access for cleaning and
sampling with residents, owners, the Cleaning Contractor and sampling technicians.
10. The Monitoring Contractor shall provide sufficient personnel to provide oversight of the
Cleaning Contractor to verify that work is being conducted in accordance with the Cleaning
Contact Scope of Work.
IL The Project Monitor shall veri^ that the Cleaning Contractor is using certified workers.
12. The Project Monitor shall conduct routine quality assurance inspections during the course
of cleaning and concur by initialing the Cleaning Checklist (to be developed) for tasks
completed satisfactorily.