14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗2002 E-Mail Sent M. Gilsenan
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000139460–000139481
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
2. The Proj ect Monitor will schedule and conduct pre-cleaning and pre-sampling inspections ofthe apartments, HVAC systems and common spaces. Residents will be provided with information regarding sampling options (aggressive and modified aggressive sampling protocols) and the handling of valuable personal items (money, jewelry, heirlooms) during work. The Project Monitor will obtain written access and authorization to clean the apartments, heating ventilation and air conditioning (HVAC) systems and common spaces using the USEPA Access Agreement (to be provided). The Project Monitor will advise EPA ifany offollowing conditions are observed: mixed residential and commercial use within a building; dust and/or debris in common spaces; the presence ofmold that may pose a hazard to residents or workers (guidelines to be provided); residents with special needs; or other circumstances that may require deviation from the procedures specified in Scope of Work. In consultation with EPA, the Project Monitor will make a determination of the appropriate Cleaning Contract Scope of Work (i.e. Scope A or B) to be employed. This determination is to be made based the descriptions included in the Cleaning Contract Scope of Work and best professionalJudgement.
3. The Monitoring contractor shall evaluate all HVAC systems in aU buildings where cleaning will take place to determine ifthese systems have been impacted by dust or debris from the collapse ofthe World Trade Center and ifthese systems require cleaning. The Monitoring Contractor will clean impacted HVAC systems utilizing specialized labor trained and experienced in duct cleaning. No residential or common space shall be cleaned until the HVAC system has been evaluated and cleaned in necessary.
4. In the event that mold is observed in a residence during the pre-cleaning inspection, a follow-up inspection will be conducted by a mold expert to determine if the mold poses a health risk to residents or workers. Ifthe presence ofmold is determined to pose a health risk, the Monitoring Contractormay be required to mitigate the problem using specialized labor trained and experienced in mold remediation.
5. The Project Monitor shall schedule and oversee the cleaning operations ofthe Cleaning Contractor. If DEP has determined that additional exterior clean up is required, no residential or common space or HVA C system shall be cleaned until the exterior ofthe building is cleaned. The Project Monitor shall coordinate daily accessfor cleaning and sampling -with residents, o-wners, the Cleaning Contractor and sampling technicians.
6. The Monitoring Contractor shall provide sufficient personnel to provide oversight ofthe Cleaning Contractor to verify that work is being conducted in accordance with the Cleaning Contact Scope of Work.
7. The Project Monitor shall veri^ that the Cleaning Contractor is using certified -workers.
8. The Project Monitor shall conduct routine quality assurance inspections during the course
3
NYC-WTC_000139470
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000138743
EPA circulates latest draft scopes of work for WTC indoor dust cleaning program requesting comments.
14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138626
Distribution of revised scopes of work documents for WTC indoor cleaning and monitoring contracts.
14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138659
Circulation of latest draft cleaning and monitoring statement of works for WTC for review and comment.
14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138725
EPA transmits revised scopes of work for WTC indoor cleaning and monitoring contracts to DEP.
13 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139232
DEP requests review of attached Scope of Work documents for mold remediation and air monitoring contracts.
10 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139209
Administrative notice instructs staff to preserve original World Trade Center documents for potential litigation.
10 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138918
Internal DEP correspondence discussing EPA draft scope of work for WTC program and clarifying agency roles and responsibilities.
10 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000162352
EPA request for review and feedback on draft scope of work documents for WTC cleaning and air monitoring contractors.
14 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161167
Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.
13 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000139208
Instructional notice requiring retention of scanned WTC documents as potential evidence in future legal actions against the City.
Filed in the same folder
NYC-WTC_000139209
Administrative notice instructs staff to preserve original World Trade Center documents for potential litigation.
Filed in the same folder
NYC-WTC_000139232
DEP requests review of attached Scope of Work documents for mold remediation and air monitoring contracts.
Filed in the same folder
NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
Filed in the same folder
Filed in the same folder