14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Cleaning and monitoring statements of work, June 2002
Machine-extracted title · confidence 85%EPA request for review and feedback on draft scope of work documents for WTC cleaning and air monitoring contractors.
NYC-WTC_000162352–000162365Folder label: “E-mails 2002 M. Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Indoor Air Residential Assistance Program Monitoring Contract Scope of Work DRAFT - 6/11/02
A. Introduction All work performed under this contract must be in compliance with all applicable, relevant, and appropriate regulations and this Scope of Work, including but not limited to those of the United States Environmental Protection Agency (USEPA), the United States Department of Labor, Occupational Safety and Health Administration (USOSHA), the New York State Department of Labor (NYSDOL), the New York State Department of Health Environmental Laboratory Approval Program (ELAP) and the New York City Department of Environmental Protection (NYCDEP). This project shall involve scheduling, coordinating and monitoring the clean up of dust/debris and air sampling from building apartments impacted by the attack and collapse of the World Trade Center.
B. Roles and Responsibilities The USEPA On-Scene Coordinator (OSC) has overall responsibilityfor insuring that work conducted as part of the Indoor Air Residential Assistance Program is completed safely, efficiently and in a compliance with the Scope of Work. As such, the OSC or designee shall have the following authorities relating to work conducted under this contract:
1. The OSC has the authority to stop workfor health and safety reasons orfor non- compliance with the Scope of Work.
2. The OSC has the authority to direct the contractor in the performance ofthe work.
3. The OSC has the authority to review and approve or disapprove of the qualifications of all contractor personnel involved in the work.
4. The OSC has the right to inspect and accept or reject any work.
[input DEP Roles and Responsibilitiesfor contract officer and project manager]
C. Qualifications Proof of qualifications must be presented upon request, including qualifications for wipe sampling, personal monitoring, HVAC and mold expertise.
Project Monitors The Project Monitors must possess valid NYS Asbestos Project Monitor certificates. Project Monitors must have served as a third party project monitor on at least 20 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 50 asbestos abatement projects.
1
NYC-WTC_000162359
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
NYC-WTC_000138659
Circulation of latest draft cleaning and monitoring statement of works for WTC for review and comment.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138743
EPA circulates latest draft scopes of work for WTC indoor dust cleaning program requesting comments.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161167
Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.
13 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138626
Distribution of revised scopes of work documents for WTC indoor cleaning and monitoring contracts.
14 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139232
DEP requests review of attached Scope of Work documents for mold remediation and air monitoring contracts.
10 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138725
EPA transmits revised scopes of work for WTC indoor cleaning and monitoring contracts to DEP.
13 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139209
Administrative notice instructs staff to preserve original World Trade Center documents for potential litigation.
10 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138918
Internal DEP correspondence discussing EPA draft scope of work for WTC program and clarifying agency roles and responsibilities.
10 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161325
Final scope of work documents for indoor dust cleaning and monitoring contractor activities in WTC cleanup program.
12 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000162065
Notice instructing staff to preserve original World Trade Center documents as evidence for potential legal actions against the City.
Filed in the same folder
NYC-WTC_000162066
Daily summary of calls received by the WTC hotline on May 1, 2002, categorized by topic.
Filed in the same folder
NYC-WTC_000162067
Daily summary of calls received by WTC hotline operators on May 1, 2002, categorized by topic.
Filed in the same folder
Filed in the same folder
NYC-WTC_000162073
Daily summary of calls received by the WTC hotline on May 2, 2002, including requests for indoor air testing.
Filed in the same folder