NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 56/No folder label
Document / 215 pages

HVAC consulting services invoice, NYC WTC site, 2003

Machine-extracted title · confidence 95%

Invoice for HVAC consulting services provided at the World Trade Center site in 2003.

NYC-WTC_000135339–000135553
Page image
Scanned page image, NYC-WTC_000135553
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

WTC HVAC Consulting Quad D

Summary of Visits Date IBuilding I Comments Started duct cleaning on west section of building. Ran into some problems due to blockage of ducts on the upper floors (12-14) by construction debris from penthouse renovation. Used two Niro 3/26/03 350 Albany St. twin vacuum, 5000 cfm (2500 each) HEPA filter, with 3-4" static pressure at outlet with negative pressure at inlet with heavy duty flexible hose. 3/27/03 350 Albany St. Completed cleaning of ducts on west section of building. Started cleaningon middle section of buildin . Cleaned HV and AC unit, and associated ducts. No tents used 3/27/03 300 Albany St. while working in pump room. Vacuum located inside, but exhaust sent outside via flexible hose. Finished cleaning HV and AC unit and associated ductwork in 3/28/03 300 Albany St. pump room. Vacuum located inside, but exhaust sent outside via flexible hose. 3/31/03 250 South End Ave. Cleaned HV unit and associated ductwork. Continued with cleaning and completed 4 risers and their 4/3/02 300 Albany St. associated ductwork. Expected to complete building on 4/4 and inspected on 4/7. Continued with cleaning and completed 2 risers and their 4/3/02 250 South End Ave. associated ductwork. HV unit and ductwork has been com leted. 4/8/02 2 South End Ave. Cleaned and com leted 5 exhaust fans and risers. Continued with cleaning and completed the remaining 3 exhaust 4/9/03 2 South End Ave. fans and risers. Started and completed cleaning of HV unit and exhaust fan. 4/9/03 380 Rector Place Entire buildin com leted with the exce tion of 1 riser. There were some unresolved issues pertaining to the scope of work. SSC was unsure whether the enclosed area above the gym ceiling was part of the return system. We determined that since this enclosed area was separated from the rest of the gym ceiling 4/10/03 2 South End Ave. but connected to the return plenum that this was indeed an extension of the return air plenum and thus a component of the HV unit. The lobby slotted registers/grilles were the looked at to determinetheapproximateamountofcleaningrequired. Started and finished cleaning of Hv unit, completing cleaning of 4/14/03 2 South End Ave. the building. Witnessed re-inspection of building with Tony Gallo of Duct Dusters. Buildin assed ins ection. Completed cleaning of riser. Entire building cleaned for re- 4/15/03 380 Rector Place inspection

NYC-WTC 000135553

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000135553Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →