Part III — Health & Safety Plan
133-135 Greenwich Streetl2l-23 Thames Street
Airtek Project 05-0701 — Rev 1, August 11.2005
• Support Zone — This area starts at the project/property fence line and extends to the entry to
where personnel enter the building to complete the work tasks. This area includes the ground
outside of the building and any office spaces. In this area all personnel shall wear Level D PPE.
Within this area exclusion zones may be established depending on the operations, for example:
where material handling is performed, where hoisting equipment is located or where equipment
is staged.
• Contamination Reduction Zone (CRZ) — This area shall be located subject to approval of the
variance. The CRZ shall exist until the completion of Abatement Phase activities. Personnel shall
be aware of and follow all site control procedures with respect to entering and exiting the CRZ,
to ensure that they are not exposed to contaminants and to minimize the potential for
contamination of personnel and the spread of contamination outside the Exclusion Zone (EZ).
These measures include having personnel follow the proper procedures for donning and removal
of PPE and washing in the CRZ. The measures also address the decontamination procedures for
use when moving equipment between zones. The CRZ shall consist of an area to drop off
equipment, plastic bags to dispose of protective clothing, adequate soap and water for personnel
and equipment decontamination and a means of capturing wash water generated during
decontamination. The CRZ shall also have a first-aid kit, fire blanket and fire extinguisher (20-lb
ABC type).
• Exclusion Zone (EZ) — This area extends from the side of the CRZ facing the building and
includes all areas on each floor of the building. This definition of the EZ shall remain effective
until Phase I activity on each floor is completed. No employee shall enter the Exclusion Zone
without the required training and PPE. No employee shall eat, drink, chew gum, apply cosmetics,
smoke or use other tobacco products while in the Exclusion Zone. The employee must first exit
the Exclusion Zone and follow decontamination procedures (Section 2.8.2.1) in the CRZ before
engaging in any of the above actions. In the event that an employee in the EZ requires a
replacement or his/her protective suit or respirator filters, the employee shall exit the EZ and
utilize proper decontamination procedures in the CRZ, replace or repair the defective PPE, then
reenter the EZ.
2.8.2 Personnel and Equipment Decontamination
When exiting the EZ, personnel shall be aware of and follow the procedures used to
decontaminate personnel, equipment, and sampling containers. Subcontractors shall ensure that
their employees follow proper decontamination and waste disposal procedures. Disposal of PPE
and other items shall be performed in accordance with Section 3 of this HASP, with material
placed in appropriately sized and labeled containers. Specific decontamination procedures are
presented in the following subsections.
2.8.2.1 Personnel Decontamination Procedure
Personnel entering containment are required to follow proper decontamination procedures. All
employees who leave the Exclusion Zone shall follow the decontamination process as outlined
below.