Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
NYC-WTC_000127738–000127777Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
• 2.8.1 Work Zones
Entry into the work zones begins once a person comes on-site. This approach reflects the dynamic nature of the operations and the need for everyone to be aware of the conditions while on-site. Using the concept of three zones for the site, the following areas are identified:
• Support Zone — This area starts at the project/property fence line and extends to the entry to where personnel enter the building to complete the work tasks. This area includes the ground outside of the building and any office spaces. In this area all personnel shall wear Level D PPE. Within this area exclusion zones may be established depending on the operations, for example: where material handling is performed, where hoisting equipment is located or where equipment is staged.
• Contamination Reduction Zone (CRZ) — This area shall be located subject to approval of the variance. The CRZ shall exist until the completion of Phase I activities. Personnel shall be aware of and follow all site control procedures with respect to entering and exiting the CRZ, to ensure that they are not exposed to contaminants and to minimize the potential for contamination of personnel and the spread of contamination outside the Exclusion Zone (EZ). These measures include having personnel follow the proper procedures for donning and removal of PPE and washing in the CRZ. The measures also address the decontamination procedures for use when moving equipment between zones. The CRZ shall consist of an area to drop off equipment, plastic bags to dispose of . protective clothing, adequate soap and water for personnel and equipment decontamination and a means of capturing wash water generated during decontamination. The CRZ shall also have a first-aid kit, fire blanket and fire extinguisher (20-lb ABC type).
• Exclusion Zone (EZ) — This area extends from the side of the CRZ facing the building and includes all areas on each floor of the building. This definition of the EZ shall remain effective until Phase I activity on each floor is completed. No employee shall enter the Exclusion Zone without the required training and PPE. No employee shall eat, drink, chew gum, apply cosmetics, smoke or use other tobacco products while in the Exclusion Zone. The employee must first exit the Exclusion Zone and follow decontamination procedures (Section 2.8.2.1) in the CRZ before engaging in any of the above actions. In the event that an employee in the EZ requires a replacement or his/her protective suit or respirator filters, the employee shall exit the EZ and utilize proper decontamination procedures in the CRZ, replace or repair the defective PPE, then reenter the EZ.
2.8.2 Personnel and Equipment Decontamination
When exiting the EZ, personnel shall be aware of and follow the procedures used to decontaminate personnel, equipment, and sampling containers. Subcontractors shall ensure that their employees follow proper decontamination and waste disposal procedures. Disposal of PPE and other items be performed in accordance with shall
The Copper Group —133-135 Greenwich Street & 21-23 Thames Sheet artalc Project OS-0710 - Phase I HASP 6-8-05 Page 27 of 40
NYC-WTC 000127764
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
9 shared non-person entities · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
35 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
11 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
23 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
41 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
13 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
11 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
17 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗22 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
Cited alongside this record in an Ask answer