Each Subcontractor and trade employer shall perform personnel air sampling for the
following contaminants during Phase I of the project: particulates as TSP, metals as TSP.
asbestos. PAlls. D/Fs. PCBs, mercury. lead and silica. Additionally, daily personnel
sampling for lead. cadmium, chromium and mercury shall he perlormed during all cutting
and torching operations as required by 29 CFR 1926.62(d1(2)(iv) and the Cadmium in
construction standard [29 CFR 1926.1 121. The results of personnel monitoring will be
reviewed on a daily basis by the Subcontractor Safety Officer to determine if current
levels of respiratory protection arc adequate. The subcontractor safety officer shall
provide written documentation of this review to CSO and the subcontractor must
immediately report any results that trigger PPE upgrades. The following table lists the
OSI IAA 1'I?l.. site specific Action Level, and trigger levels:
Table 2-2
4i5 . ActN,n I_etel
11'~~ erti,n 1~I~_I_ II'itte~i+Pay
('uun(anuin:allI !l"1i.~ I I. ilaill ~alifec~t
fictur fair Half- I'actor l61. Full-
nl inr all 1 .. nlc n1 „ nt ni Ilt_ n1
I ;tlritint 1:1 in I ,` 1 1'_ n'. ? Ill^_ Ill
1, . ....
li 'I'- 11it1111 I1 I' 11)_ IY' 1 I11 L7~~
i. ..idnll i in 1 1 11 Ill'_ I11 1L Ill_ iu I ' 1: I11'_ 111 12n11 111
IlI Il1lUill ~ 1 1 1 i ' 1 .` Ill_ I'It ' i -" In-11 l • .' Ill" Ill • ~I ' 111_ 11t _
~. (-' 1- ,: i' Ill'_ I'i I~~ 'i Ill'_ I I 1 1I I 'I 1'J 111 • 1 I" i I 'I 1'. inl
:;P-I ' 1 i 1:• III:: I 1 ' 1 1 1 ~ .` Ill' I'!1 ' I .` I - I_ I 1 . Ini Ill
1;111 J:IfP.'~••: • i i II I .1 1 II1" Ilt ' `Ipl Il l'J 1'll
1 Iii i i 11': Ill 111': I l
I l II '1'_ Ill I
~. i_L; ..1 1 PIV_ Iil ' I = n1•' Ill ' 1 1 i 111•.'. I'Il ~ .. 1 1 n 1 I17_t 111
Ill `I ' iii''. I t - i" 1 Ill'_ in
2.8 SITE CO1 .11W
Site control measures shall be implemented to protect the pu!~tic and personnJ n i_un
on-site. The aspects of site control shall address general access to the site; and r cc s to
the building and site during the deconstruction phase.
Fences. guardrails and access devices, including ladders, stairways, and walking surfaces
shall be provided and maintained throughout the project activities in accordance with 29
CFR 1926. In addition, ban-icades, warning signs and devices. temporary lighting and
other safety measures shall be provided, as required, to protect site personnel.
All visitors to the site shall report first to the Contractor field office. Visitor access shall
be limited to the Support Zone and Level 1) operation areas only, and shall be allowed
only with the prior consent of the Contractor NYC SSM and the Contractor Site Manager.
No visitor shall enter a work area unescorted by a Subcontractor or Contractor
representative. The presence of any regulatory agency on-site shall be reported
immediately to the Contractor Site Manager.
The Copper Group -133-135 Greenwich Street & 21-23 Thames Street
nn
Airtek Project 05=0710 - Phase I HASP 6-8-05 Page 26 of 40
NYC-WTC 000127763