Part W- Waste Management Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701— Rev 1, September 16, 2005
8.2 Universal Waste
Universal waste will be treated as a separate operation at a separate time
according to hazardous waste regulations. See 8.1 above.
Q:3) Asbestos Waste
Waste containing asbestos will be wet down to prevent visible emissions of
asbestos dust into the air. The asbestos waste will be sealed while wet in a leak-
tight container. A supply of leak tight containers will be kept in the waste storage
area to provide adequate repackaging if a break in the container should occur.
Storage area shall be maintained under a negative pressure ventilation system.
Daily inspections of the waste storage area shall be required. R Q ~, ;
c'-cI 5l "-s e -Xvcv-
p
Storage of asbestos waste will not exceed 50 cubic yards. Authorization from the
New York City Department of Sanitation (NYCDOS) and additional
requirements, per code, will be required if accumulation of asbestos is anticipated
to be greater than 50 cubic yards. Containers holding asbestos waste will be
inspected daily to ensure no visible emissions of asbestos dust in the air or breaks
in the container.
8.4 Exterior Wash Water
Wash water collected per the Work Plan shall be pumped to new, clean 55-gallon
drums. Aliquots from each drum of wash water will be collected. For each day of
work, the aliquots will be composited into one sample to be analyzed for Full
TCLP and RCRA characteristics. If the water is not regulated under RCRA, it will
be filtered through a 5 micron filter prior to disposal to the NYC sewer system per
NYC Title 15, Part 1-82 (b) 1. If testing indicates the water is regulated under
RCRA, it will be handled, packaged and disposed of in strict accordance with its
categorization. Until its determination as hazardous waste, it will be stored in the
ACM waste decontamination unit as permitted by NYC DEP Title 15. All
filtration media and PPE associated with this operation will be handled as ACM
waste pending HazWaste determination.
8.5 PCB Waste
Non-leaking waste PCB waste will be packaged in suitable containers and
immediately loaded for disposal off site. Any leaking PCB articles or containers
will be transferred to properly marked, non-leaking containers or an over-pack
container.
9.0 Transportation Requirements
All waste materials will be transported in accordance with applicable local, state and
federal DOT regulations including, but not limited to, bills of lading, manifests, placards,
16