Part IV- Waste Management Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 — Rev 1, September 16, 2005
etc. All wastes will be shipped using properly permitted vehicles operated by drivers with
Commercial Drivers Licenses (CDLs) and Hazardous Materials endorsements. All
hazardous waste will be shipped using transporters with RCRA identification numbers.
The actual modes of transportation to be utilized will be determined following the
identification of all anticipated waste streams and will take into account the location and
distance to the selected disposal facility as well as cost considerations. All off-site
shipments of waste will adhere to the site-specific transportation requirements. As
required by NYSDEC (6 NYCRR Part 364) all hazardous and asbestos wastes will be
transported using Part 364 permitted haulers.
10.0 Travel Routes
Travel route(s) will be determined following discussion with the appropriate regulatory
agencies (e.g., New York City Department of Transportation), and the Lower Manhattan
Construction Command Center (LMCCC). The selected waste transporter(s) will follow
the designated travel routes. These routes cannot be determined until EPA approval of the
project, as the timing and routing are interdependent on other project occurring in the
area.
11.0 Disposal Facilities
Waste recycling/disposal facilities will be selected based on several factors including
waste types, facility acceptance criteria, regulatory compliance history, etc. Only those
facilities that have valid federal/state/local permits to accept the waste type proposed for
recycling/disposal at the facility will be used.
12.0 Documentation
All applicable local, state and federal documentation and record keeping
requirements/guidelines will be followed. Documentation for hazardous waste disposal
includes hazardous waste determination documentation including all analytical results,
Hazardous Waste Manifesting, EPA Generator ID, EPA transporter ID, EPA ID for waste
disposal facility and waste storage locations and capacities. Also documented will be
emergency notification and operating procedures, organizational chart, unexpected waste
procedures, contractor involvement list and copies of the regulatory requirement
certifications of transporters, disposal facilities, etc. Specific regulatory documentation
may change depending on the types and amounts of waste to be generated. The
Contractor shall be responsible for document management.
All documentation noted under this Section shall be retained for a period of not less than
three years after the completion of the project.