Background sampling chain of custody, 250 Broadway, Sept 2001 — page 15
Summary Chain of custody documentation for background sampling including asbestos and lead at 250 Broadway in September 2001.
Non-asbestos fiber i.d.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary Chain of custody documentation for background sampling including asbestos and lead at 250 Broadway in September 2001.
Non-asbestos fiber i.d.
Summary Chain of custody documentation for background sampling including asbestos and lead at 250 Broadway in September 2001.
1187 New York, NY 10007 Report Date: 09/16/01 ASBESTOS
Samples reported as ct % or none PLM has been i nown to miss asbestos in a small percentage of aamplee which contain asbestos.
Summary Facsimile transmission cover sheet dated July 17, 2002, likely related to environmental or inspection matters at 15 Maiden Lane.
Asbestos Control ram £49-17 Junction Boulevard, &® poo, coe NY 11368-6107 ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) &. e the NYC DEP not less than one week in advance of the start of abatament ) When this
0.0 0 0 0 Amphibole Asbestos
Summary Letter reporting asbestos testing results for air and dust at Borough of Manhattan Community College in February 2002.
Table 2 Asbestos in Dust SamnlinR Sample No.
Summary Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 1S, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control
Summary Notice for mandatory pre-bid meeting regarding asbestos abatement scope of work at 125 Cedar Street (110 Liberty Street).
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control
Summary Notice for mandatory pre-bid meeting regarding asbestos abatement scope of work at 125 Cedar Street (110 Liberty Street).
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter I of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control
Summary Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Permit application detailing background debris conditions and requirements for licensed contractors to clean interior surfaces.
The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.
Summary Permit application detailing background debris conditions and requirements for licensed contractors to clean interior surfaces.
The interior cleaning is to be accomplished by a licensed asbestos abatement contractor.
Summary Resident request for DEP to perform cleaning and monitoring work at an apartment in Manhattan.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Asbestos project notification and inspection report form dated February 26, 2003 required for NYC DEP and Department of Buildings submittal.
ASBESTOS ABATEMENT CONTRACTOR 12. Name ETS CQt "Cling. Inc. 13. Contact Person Robert Middleton 14.
Summary Permit application for asbestos abatement contractor to clean interiors of a building at 125 [name].
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Memo inviting contractors to bid on a cleaning contract at 125 Liberty Street following the WTC collapse.
(2) An ACP-7 form, asbestos project notification form shall be submitted as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
This sawpling must be un4ertaksn immediately becanee asbestos fibers in* ventilation systems are likely to deposit throughout the building.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Not surprisingly, asbestos became the priority substance to test for at 105 Duane.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
it is also licel that there are already epartr~ents in the building in w _c he asbestos duet levels are much hi her.
Summary Summary of ambient air sampling and visual observations at 105 Duane Street following the WTC collapse.
(EDS/SAED): None detected Amph i bole Asbestos Type: None detected -------- --------------------------------------------------------------------------------------------------------------