114 LIBERTY 2 OF 2 — page 8
Asbestos fibers; 2. Dioxins and furans; and 3.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Asbestos fibers; 2. Dioxins and furans; and 3.
Licensed and certified New York State and New York City asbestos abatement workers and supervisors, in addition, all workers and supervisors must also have a valid certificate
CONTAMINATED MATERIALS feet of floor space over 25,000 square feet, plus appropriate blanks, shall be collected both inside and outside each work area and analyzed for Asbestos
Asbestos fibers: 2. Dioxins and furans; and 3.
All Work will be performed in accordance with applicable asbestos regulations including, but not limited to, the Rules of the City of New York Title 15, Chapter 1 (specific use of licensed asbestos
Licensed and certified New York State and New York City asbestos abatement workers and supervisors.
CONTAMINATED MATERIALS feet of floor space over 25,000 square feet, plus appropriate blanks, shall be collected both inside and outside each work area and analyzed for Asbestos
All waste generated shall be treated as asbestos-containing material (ACM) with the exception of items that can be cleaned prior to disposal.
Summary A single scanned page from the 125 Cedar administrative file containing illegible text or data fields.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
Summary Contractor work scope for air monitoring and environmental surveillance at 125 Cedar building.
Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein.
NYC 9/11 Public Portal Document i AIRBORNE ASBESTOS ANALYSIS BY TRANSMISSION
Summary Interdepartmental correspondence discussing failed DEP attempts to access and reinspect an unoccupied apartment, documenting denial of access and landlord-reported cleaning prior…
Also, I think its important to understand, that individual letters with the asbestos results have already been provided to each building owner/manager and occupants of the residences tested.
This allows for precise asbestos quantification.
Summary Correspondence criticizing the EPA and DEP regarding asbestos, silica levels, and safety clearance after cleaning at 114 Liberty Street.
Non-asbestos fireproofing was sprayed onto the original ceilings before installing die suspended drywall.
Summary Correspondence criticizing the EPA and DEP regarding asbestos, silica levels, and safety clearance after cleaning at 114 Liberty Street.
The quantitative wipe method for asbestos is ASTM Method 6480, and was the method used by EPA in its 110 NYC-WTC_000154978
Summary Department record detailing tenant concerns about asbestos cleanup methods and subsequent sampling results at 125 Cedar Street.
The caller reported that tenants of the building had taken samples that were found to be asbestos-containing material.
Summary Memo documenting on-site inspections of buildings near the World Trade Center to assess debris and suspect materials.
Report Date 04/24/2002 12:50 PM Submitted By Page 1 Service # 417313 Problem BWTC ASBESTOS
Summary Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
HVAC ductwork shall be cut and blanked prior to beginning any asbestos abatement.
Summary Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
and gypsum wallboard) from the work area and dispose of as asbestos contaminated waste. 12.
Summary Memo forwarding database design with comments on legal department access requirements and environmental substance tracking expansion.
The proposal contemplates the addition of 2 substances (beyond asbestos) to the database (p. 2, 1®* full bullet).