December 17, 2002 114 LIBERTY STREET
REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS
3.04 DESCRIPTION OF WORK;
A. The Contractor shall perform removal of dust, debris and contaminated materials and provide
the services as follows:
1. Licensed and certified New York State and New York City asbestos abatement workers
and supervisors. In addition, all workers and supervisors must also have a valid
certificate of completion from an EPA approved lead worker training course.
2. All applicable notifications, permits and approvals.
3. Work Area preparation, including protection of all surrounding fixtures as described
herein.
4. Removal of dust, debris, and contaminated material to include the bllowing:
a. The Contractor shall furnish all labor, materials, services, and equipment
necessary to facilitate the removal and disposal of all contaminated dust and
debris; cleaning, removal and disposal of all remaining tenant fixtures and
furnishings; and demolition, removal and disposal of gypsum wall and ceiling
board, HVAC units, ductwork, BX electrical cables, spray-on fireproofing, etc. All
work is to be performed as described herein.
b. Contractor to provide engineering controls to reduce, control and isolate any
aerosols caused by the work. Controls may include, but are not limited to. Work
Area isolation with plastic sheeting, construction of wooden barriers, installation
of HEPA air filtration devices, construction of decontamination chambers and
cleaning of the Work Area. All work shall be performed as described herein.
c. The Contractor shall furnish all labor, materials, services, appurtenances and
equipment necessary for total dust, debris, and contaminated material removal
under strict control procedures. Such work shall include, but not necessarily be
limited to, the following:
1. Cleaning and removing of specific non-porous tenant furnishings (i.e.,
kitchen cabinets and countertops, etc.), which will be re-installed by
another contractor, following completion of the abatement work;
2. Bagging, removing, and disposing of all porous items (including, but not
limited to, gypsum board, spray-on fireproofing, fiberglass batting and
pipe insulation, etc.) as asbestos contaminated waste;
3. Cleaning, removing, and proper disposal of all non-porous items
(including, but not limited to, HVAC ductwork, book shelves, appliances,
etc.), unless otherwise noted;
4. Using HEPA vacuuming and wet wipe methods, and/or other
appropriate methods as approved by Ambient Group, to remove
contaminated dust from any non-porous items that will not be physically
removed;
7