December 17, 2002 114 LIBERTY STREET
REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS
01 SUMMARY OF WORK
PART 1 - GENERAL
1.01 SUMMARY OF AREA CONTAMINATION
A. The accumulation of dust was the result of the destruction and collapse of the World Trade Center
towers on September 11,2001. Dust and pulverized building construction debris penetrated the
building through openings in the building’s exterior facade. The dust, contaminated with various
contaminants including, but not necessarily limited to, heavy metals and asbestos, is present
throughout 114 Liberty Street.
B. Initial sampling conducted by Ambient Group in June of 2002, revealed that various
contaminants were present at detectable levels in the dust, including the following:
1. Asbestos fibers:
2. Dioxins and furans; and
3. Various metals, including, but not limited to, cadmium, chromium, copper, lead, mercury,
nickel and zinc;
C. Mold growth has been identified on certain porous materials, particularly underneath the
hardwood flooring on the north side of the building, from the top floor down to the basement
level, as a result of water damage following the WTC attacks. Damage to the building fagade,
from falling debris, left the building open to the elements. In addition, water damage within the
building occurred as a result of penetrations in the roofing system due to felling debris.
1.02 PROJECT/WORK IDENTIFICATION:
A. The Project name is Removal of Dust, Debris and Contaminated Materials at 114 Liberty Street,
New York, NY as shown on Design Documents dated December 17, 2002 as prepared by
Ambient Group, Inc.
B. The Work includes cleanup and disposal of all contaminated dust from the demised premises on
each floor, including core and shell building improvements, of 114 Liberty Street.
C. It is the intent of this project to remove the aforementioned dust, debris and contaminated
materials (including furnishings) from the demised tenant premises and demolish and remove
tenant improvements and betterments and base-building furnishes, including but not limited to
HVAC units and associated duct work, carpeting, gypsum wall and ceiling board, exposed
hardwood flooring, pipe insulation, spray-on fireproofing etc. The Contractor shall begin
abatement work starting on the top floor and working down. The sequence of abatement on
each floor is as follows:
1. Building of centrally located personal and waste decontamination units;
2. Installation of isolation barriers over windows, doors, ceiling penetrations, etc. using two
layers of 6-mil polyethylene sheeting and sealed with tape, as well as protecting the floor
with two layers of 6-mil reinforced polyethylene sheeting and sealed with tape;
2
© AMBIENT GROUP, INC.-2002 SUMMARY OF WORK
NYC-WTC_000155719
OCR can misread numbers and units. Confirm readings against the page image before using them.