NYC-WTC_000094750
Cover sheet transmitting a 15-page laboratory report regarding environmental testing at 80 Wall Street.
Environmental Protection, Dept. of · Box DEP Box 02
machine-extracted · confidence 1.00 · Check page ↗1992-01-01 – 2003-08-21
machine-extracted · confidence unavailable · Check page ↗Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
| Month | Pages |
|---|---|
| Jul 1997 | 4 |
| Sep 1997 | 1 |
| Oct 1997 | 4 |
| Dec 1997 | 1 |
| Sep 2001 | 1 |
| Jun 2002 | 1 |
Fee summary for OEM project design, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM 7 WTC Design Services, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM Design Services at 7 WTC · page 1machine-extracted · confidence unavailable · Check page ↗
Approval of architectural team for OEM 23rd floor project, Feb · page 2machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM 7 WTC Design Services, Sept 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee summary for OEM project design, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM 7 WTC Design Services, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM Design Services at 7 WTC · page 1machine-extracted · confidence unavailable · Check page ↗
Approval of architectural team for OEM 23rd floor project, Feb · page 2machine-extracted · confidence unavailable · Check page ↗
Structural engineering fee proposal for OEM, Dec 17, 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Document fragment, DEP Box 38 · page 5machine-extracted · confidence unavailable · Check page ↗
Fax transmittal for lab report, 80 Wall Street, Jun 2002 · page 3machine-extracted · confidence unavailable · Check page ↗
Document fragment, DEP Box 38 · page 2machine-extracted · confidence unavailable · Check page ↗
Law Department notice on WTC document preservation, Oct 2001 · page 55machine-extracted · confidence unavailable · Check page ↗
Law Department notice on WTC document preservation, Oct 2001 · page 55machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000156176 · page 2machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000156176 · page 23machine-extracted · confidence unavailable · Check page ↗
Proposal for MEP engineering services dated May 6, 1992 · page 9machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167229 · page 2machine-extracted · confidence unavailable · Check page ↗
Fee proposal for structural engineering services, Dec 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee proposal for structural engineering services, Dec 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
DCAS approval letter re: OEM consultant team, Nov 1997 · page 2machine-extracted · confidence unavailable · Check page ↗
Fee summary and cost breakdown, 7 World Trade Center, 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Consultant proposal letter re: OEM design services, Oct 1997 · page 2machine-extracted · confidence unavailable · Check page ↗
Architectural and engineering design services proposal, 7 World Trade Center, · page 2machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM 7 WTC Design Services, June 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural summary transmittal, OEM project, Aug 1997 · page 2machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000094750
Cover sheet transmitting a 15-page laboratory report regarding environmental testing at 80 Wall Street.
Environmental Protection, Dept. of · Box DEP Box 02
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000107984
Fragmented document page from DEP Box 38 containing only a reference number and no readable text.
Environmental Protection, Dept. of · Box DEP Box 38
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000107984
Fragmented document page from DEP Box 38 containing only a reference number and no readable text.
Environmental Protection, Dept. of · Box DEP Box 38
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000145345
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Environmental Protection, Dept. of · Box DEP Box 08
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Environmental Protection, Dept. of · Box DEP Box 08
machine-extracted · confidence 1.00 · Check page ↗Environmental Protection, Dept. of · Box DEP Box 31
machine-extracted · confidence 1.00 · Check page ↗Environmental Protection, Dept. of · Box DEP Box 31
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000166571
Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167235
Fee proposal from The Cantor Seinuk Group P.C. for structural engineering services at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167240
Letter from The Cantor Seinuk Group proposing structural engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167244
Department of Citywide Administrative Services approves the selected architectural and engineering consultant team for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167247
Itemized cost breakdown for architectural, MEP engineering, and verification services across multiple zones at 7 World Trade Center by square footage and rate.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167249
Letter from a consultant submitting a proposal for architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167252
Detailed fee breakdown for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167291
Architectural firm proposal for design services for Mayor's Office of Emergency Management center at 7 World Trade Center, including scope of work and consultant proposals, dated…
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167294
Fee summary document detailing costs for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167295
Fee summary document detailing costs per square foot for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167297
Fee summary outlining costs for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167300
Fee summary detailing costs for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167759
Fee proposal from The Cantor Seinuk Group to provide structural engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000170843
DCAS approves a consultant team to perform architectural and engineering services for the Mayor's Office of Emergency Management on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000170847
Transmittal of a revised architectural summary for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Boxes, folders and agencies this entity's source pages are filed under. Folder labels are omitted to avoid surfacing personal names.
Volume NYC-WTC0004.
Fax transmittal for lab report, 80 Wall Street, Jun 2002 · page 3machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0004.
Document fragment, DEP Box 38 · page 2machine-extracted · confidence 1.00 · Check page ↗
Document fragment, DEP Box 38 · page 5machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0006.
Law Department notice on WTC document preservation, Oct 2001 · page 55machine-extracted · confidence 1.00 · Check page ↗
Law Department notice on WTC document preservation, Oct 2001 · page 55machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0006.
NYC-WTC_000156176 · page 2machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000156176 · page 23machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Proposal for MEP engineering services dated May 6, 1992 · page 9machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000167229 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee proposal for structural engineering services, Dec 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Fee proposal for structural engineering services, Dec 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Structural engineering fee proposal for OEM, Dec 17, 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
DCAS approval letter re: OEM consultant team, Nov 1997 · page 2machine-extracted · confidence 1.00 · Check page ↗
Consultant proposal letter re: OEM design services, Oct 1997 · page 2machine-extracted · confidence 1.00 · Check page ↗
Architectural and engineering design services proposal, 7 World Trade Center, · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee summary and cost breakdown, 7 World Trade Center, 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee summary for OEM project design, Oct 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee Summary for OEM 7 WTC Design Services, Oct 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee Summary for OEM Design Services at 7 WTC · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee Summary for OEM 7 WTC Design Services, Sept 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Fee Summary for OEM 7 WTC Design Services, June 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Approval of architectural team for OEM 23rd floor project, Feb · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Architectural summary transmittal, OEM project, Aug 1997 · page 2machine-extracted · confidence 1.00 · Check page ↗