Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 asbestos waste has been placed prior to removal from the Work Area.

67. Structural Member: Eoad-supporting member of a facility, such as beams and load-supporting walls, or any nonload-supporting member, such as ceiling and nonload- supporting walls.

68. Surfactant: Chemical wetting agent added to water to improve penetration.

69. Visible Emissions: Emissions containing particulate material that are visually detectable without the aid of instruments.

70. Washroom: Room between the Work Area and the holding area in the equipment decontamination enclosure system where equipment and waste containers are wet cleaned and/or HEPA-vacuumed prior to disposal.

71. Wet Cleaning: Removal of asbestos fibers from building surfaces and objects by using cloths, mops, or other cleaning tools which have been dampened with amended water.

72. Work Area: Designated rooms, spaces, or areas of the building or structure where asbestos abatement activities take(s) place.

73. Worker Decontamination Enclosure System: Portion of a decontamination enclosure system designed for controlled passage of workers and authorized visitors, consisting of a clean room, a shower room, and an equipment room separated from each other and from the Work Area by airlocks and curtained doorways.

74. Work Site: Premises where abatement activity is being performed. May be composed of one or more Work Areas.

1.14 SPECIAL PRECAUTIONS

A. The abatement project shall require a detailed plan of action to be prepared by the Abatement Contractor for acceptance by the Construction Manager prior to commencement of work.

The developed detail plan of action shall contain special preparation, removal and cleanup techniques. The purpose of these special techniques is to intercept removed asbestos containing materials before they settle in nooks and crannies and become difficult to clean.

The detailed plan of action shall also include location(s) of asbestos control area(s), decontamination chamber(s), sequencing of asbestos related work, disposal plan, type of foam and asbestos sealer to be used, air monitoring and a detailed description of the method to be employed in order to control pollution, including but not limited to emergency procedures for fire and medical emergencies and for failure of seals. This plan must be approved by the Construction Manager prior to the start of any asbestos

02082-21

CITY_21 MCI 00_014563794

NYC-WTC_000454594

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454594Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →