SECTION 02082
breathing zone.
56. Personal Protective Equipment (PPE): Appropriate protective clothing, gloves,
eye protection, footwear, and head gear.
57. Physician: Person licensed or otherwise authorized under Article 131 Section
65.22 of the New York State Education Law.
58. Plasticize: Cover floors and walls with polyethylene sheeting as herein specified
or by using spray plastics as acceptable to the Department.
59. Professional Engineer (PE): Individual having, at a minimum, a bachelor's degree
in engineering from an accredited college or university with four years acceptable
experience as an engineer and who has successfully completed both levels of the
professional engineers examination administered by the State of New York
Department of Education, Division of Professional Licensing.
60. Qualitative Pit Test: Individual test subject's responding (either voluntarily or
involuntarily) to a chemical challenge outside the respirator face-piece. Three of
the most popular methods include: 1) irritant smoke test; 2) odorous vapor test;
and 3) taste test.
61. Quantitative Pit Test: Exposing the respiratory wearer to a test atmosphere
containing an easily detectable, nontoxic aerosol, vapor or gas as the test agent.
Instrumentation, which samples the test atmosphere and the air inside the face
piece of the respirator, is used to measure quantitatively the leakage into the
respirator. There are a number of test atmospheres, test agents, and exercises to
perform during the test.
62. Registered Architect (RA): Individual having, at a minimum, a bachelor's degree
in architecture from an accredited college or university with three years
acceptable experience as an architect and who has successfully completed both
levels of the architects registration examination administered by the State of New
York Department of Education, Division of Professional Licensing.
63. Removal: Stripping of any asbestos- containing materials from surfaces or
components of a facility or taking out structural components in accordance with
40 CPR 61 Subparts A and M.
64. Shower Room: Room between the clean room and the equipment room in the
worker decontamination enclosure with hot and cold running water controllable at
the tap and arranged for complete showering during decontamination.
65. Small Asbestos Project: asbestos project involving the disturbance (e.g. removal,
enclosure, encapsulation) of more than 25 and less than 260 linear feet of friable
ACM or more than ten and less than 160 square feet of friable ACM.
66. Staging Area: Work Area near the waste transfer airlock where containerized
02082-20