NYC 9/11 Public Portal Document
Asbestos Abatement
to airborne fibers. The sample is collected outside the respirator in the
worker's breathing zone.
56. Personal Protective Equipment (PPE): Appropriate protective clothing,
gloves, eye protection, footwear, and head gear.
57. Physician: Person licensed or otherwise authorized under Article 131
Section 65.22 of the New York State Education Law.
58. Plasticize: Cover floors and walls with polyethylene sheeting as herein
specified or by using spray plastics as acceptable to the Department.
59. Professional Engineer (PE): Individual having, at a minimum, a
bachelor's degree in engineering from an accredited college or
university with four years acceptable experience as an engineer and who
has successfully completed both levels of the professional engineers
examination administered by the State of New York Department of
Education, Division of Professional Licensing.
60. Qualitative Fit Test: Individual test subject's responding (either
voluntarily or involuntarily) to a chemical challenge outside the
respirator face-piece. Three of the most popular methods include: 1)
irritant smoke test; 2) odorous vapor test; and 3) taste test.
61. Quantitative Fit Test: Exposing the respiratory wearer to a test
atmosphere containing an easily detectable, nontoxic aerosol, vapor or
gas as the test agent. Instrumentation, which samples the test
atmosphere and the air inside the face-piece of the respirator, is used to
measure quantitatively the leakage into the respirator. There are a
number of test atmospheres, test agents, and exercises to perform during
the test.
62. Registered Architect (RA): Individual having, at a minimum, a
bachelor's degree in architecture from an accredited college or
university with three years acceptable experience as an architect and
who has successfully completed both levels of the architects registration
examination administered by the State of New York Department of
Education, Division of Professional Licensing.
63. Removal: Stripping of any asbestos- containing materials from surfaces
or components of a facility or taking out structural components in
accordance with 40 CFR 61 Subparts A and M.
64. Shower Room: Room between the clean room and the equipment room
in the worker decontamination enclosure with hot and cold running
water controllable at the tap and arranged for complete showering
CAPITAL PROJECT NUMBER PO79201K 02081-1 7
100: CONTRACT DOCUMENTS REV. May 3,2000
- 1 7 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_0 06631266
NYC-WTC_000416778
OCR can misread numbers and units. Confirm readings against the page image before using them.