NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

during decontamination.

65. Small Asbestos Project: asbestos project involving the disturbance (e.g. removal, enclosure, encapsulation) of more than 25 and less than 260 linear feet of friable ACM or more than ten and less than 160 square feet offriable ACM.

66. Staging Area: Work Area near the waste transfer airlock where containerized asbestos waste has been placed prior to removal from the Work Area.

67. Structural Member: Eoad-supporting member of a facility, such as beams and load-supporting walls, or any nonload-supporting member, such as ceiling and nonload- supporting walls.

68. Surfactant: Chemical wetting agent added to water to improve penetration.

69. Visible Emissions: Emissions containing particulate material that are visually detectable without the aid of instruments.

70. Washroom: Room between the Work Area and the holding area in the equipment decontamination enclosure system where equipment and waste containers are wet cleaned and/or HEPA-vacuumed prior to disposal.

71. Wet Cleaning: Removal of asbestos fibers from building surfaces and objects by using cloths, mops, or other cleaning tools which have been dampened with amended water.

72. Work Area: Designated rooms, spaces, or areas of the building or structure where asbestos abatement activities take(s) place.

73. Worker Decontamination Enclosure System: Portion of a decontamination enclosure system designed for controlled passage of workers and authorized visitors, consisting of a clean room, a shower room, and an equipment room separated from each other and from the Work Area by airlocks and curtained doorways.

74. Work Site: Premises where abatement activity is being performed. May be composed of one or more Work Areas.

1^ STANDARD OPERATING PROCEDURES A. Develop and implement a written standard procedure for abatement work to ensure maximum protection and safeguard from asbestos exposure of the workers, visitors, employees, public, and environment.

B. TEEEPHONE PAGING DEVICE CAPITAL PROJECT NUMBER PO79201K 02081-1 8 100: CONTRACT DOCUMENTS REV. May 3,2000 - 1 8 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631267

NYC-WTC_000416779

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416779Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →