Asbestos Abatement
and well being; and
c. To prescribe methods to eliminate, control, or reduce such
stresses when necessary to alleviate their efforts.
43. Earge Asbestos Project: Asbestos project involving the disturbances (e.g.
removal, enclosure, encapsulation) of 260 linear feet or more of friable
ACM or 160 square feet or more of friable ACM.
44. Major Violation: Any action, on the job performance or lack of
performance that may place any individual at risk other than the worker
who commits the violation. A major violation is equivalent to two
violation points.
45. Minor Asbestos Project: Project involving the disturbance (e.g. removal,
enclosure, encapsulation, repair) of more than three linear feet, but not
more than 25 linear feet of friable ACM or more than three square feet,
but not more than ten square feet of friable ACM.
46. Minor Violation: Any action, on the job performance or lack of
performance that may place the worker at risk. A minor violation is
equivalent to one violation point.
47. Movable Object: Unit of equipment or furniture in the Work Area that can
be removed from the Work Area.
48. Negative Air Pressure Equipment: Portable local exhaust system equipped
with HEPA filtration. The system shall be capable of creating a negative
pressure differential between the outside and inside of the Work Area.
49. NESHAPS: National Emission Standards for Hazardous Air Pollutants.
50. NIOSH: National Institute for Occupational Safety and Health.
51. NYSDOL: New York State Department of Eabor.
52. Occupied Area: Area of the work site where abatement is not taking place
and where personnel or occupants normally function or where workers are
not required to use personal protective equipment.
53. OSHA: Occupational Safety and Health Administration.
54. Person: Individual, partnership, company, corporation, association, firm,
organization, governmental agency, administration, or department, or any
other group of individuals, or any officer or employee thereof.
55. Personal Air Monitoring: Method used to determine employees' exposure
CAPITAL PROJECT NUMBER PO79201K 02081-1 6
100: CONTRACT DOCUMENTS REV. May 3,2000
- 1 6 -100% CONTRACT DOCUMENTS