NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 1 Mar 72

rock requirements. Maxi­ S 5 o o o mum fragment size gradation o can be estimated by studying the spacing of joints in bed­ o' -------------0—3—0---------- -a, >> rock or size of talus pro­ « 3 duced from outcrops. Si « . Si lu S ’ « « a. Riprap. The degree O “■ « of fragmentation in blasting o' I—— o for riprap must be controlled so that proper size and gra­ dation can be obtained. Coyote blasting may be used for producing large rocks DIRECTION OF THROW for riprap and breakwaters quickly and economically (see c below). In some rocks, EXCAVATION low-velocity ammonia dyna­ mites are used because of their low shattering effects. ANFO, while often detonat­ Fig. 5-23. Main charge delays, in ing at a higher velocity than numerical sequence progressing many low-velocity ammonia parallel to the presplit, reduce dynamites, is also used, back pressure in wall largely due to its lower price per pound. However, coyote blasting seldom yields well-sorted rock for riprap, and secondary blasting (mudcapping or blockholing), as well as screening off of fines, may be necessary. Restraint should be exercised in considering the coyote method for jetty stone. Jetty stone quarries commonly contain only about 10 to 20 percent of the best grade large stones and the excessive fracturing and poor control of a coyote blast can ruin a quarry. Depending on their availability, it may be advantageous to mine these stones one by one by multiple-row or irregular array.

b. Aggregate.

(1) Material used for concrete aggregate usually is of small sizes, and therefore blasts should be designed to produce a high degree of fragmentation and thereby reduce handling and crushing costs.

(2) Good fragmentation is commonly achieved by adequately charged, staggered holes in a pattern utilizing the optimum spacing/ burden ratio and detonated by a millisecond delay system (Fig. 5-24). Staggered holes allow more of the rock to be affected by the blast and thus produce better breakage throughout. The spacing should

5-24

CITY_21MC100_0 12669695

NYC-WTC_000435925

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435925Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →