Fig. 5-24. Plan of blasthole pattern for fragmentation of
rock to produce aggregate
normally be 1-1/2 to 2 times the burden.
(3) Explosives with high detonation velocity and consequent
shattering power are most effective for fragmentation. However,
cheaper blasting agents at wider spacing, if properly boosted, frag
ment well and are usually used.
(4) Small holes (1-1/2 to 4 in.) at closer spacing distribute the
explosive and produce better breakage, especially at the top where
good fragmentation is difficult to achieve in some rocks.
c. Rock Fill for Dams.
(1) Rock fills cbmmonly consist of all rock fragments below a
specified size. A rock fill is most stable and solid if the rock frag
ments are angular, the largest pieces are smaller than the depth of
the lift, and the sizes are well mixed to include a suitable proportion
of fines.
(2) The production of fill can be most easily controlled by using
vertical or inclined blastholes and changing the patterns to meet vary
ing rock conditions.