drilled holes shall be cut to achieve a complete separation of the rock
formation along the broached line.
J. In areas i4iere footings and foundation walls are to be constructed, excavate
to the grades indicated on the Drawings, and to rock which meets the New
York City Building Code requirements for a bearing value of 40 tons per
square foot. Rock underpinning for the existing West Yard building, under
caissons for the 10th and 11th Avenue bridges, and under jacking apparatus
for the north access tunnel, shall meet the New York City Building Code
requirements for a bearing value of 60 tons per square foot.
1. Immediately after approver of the bearing capacity of’the footing by the
Engineer, all seams and fissures in the rockat bottoms of footings
, shall be grouted. Top of the sealed surface shall be at the design
elevation of the bottom of the footing.
3.03 EXPLOSIVES AND BLASTING
A. The Contractor shall make himself fully aware of the character, use, and
occupancy of adjoining buildings prior to start of blasting operations and
shall regulate his work accordingly. -
B. Where blasting is required, use only persons skilled and experienced in such
work. Handle and store detonators and explosives, and conduct blasting
operations in strict conformance with the regulations and ordinances of the
authorities having jurisdiction, and as required to avoid damage to property
and injury to persons. All blasting shall be done by a licensed blaster.
C. Charges shall be of such power and so placed that the blasts will not make
the excavations unduly large, will not shatter ealjoining rock, and will; not
cause movanent or damage to.utilities, structures.or other; work in the
vicinity. Properly cover each blast with steelmats. Blastingcaps shall
be of a type that wiIT not be affected by the presence of live contact rail,
signal and electrical equipment, radio transmissions or.railroad operations
in the existing railroad tunnel. Detonating devices shall conform to local
codes and to Amtrak requirements. The Contractor shallsubmit his proposed
procedures and materials for blasting to the Engineer for approval^
0. Comply with applicable paragraphs of the "Manual of Accident Prevention in
Construction of A6CA Inc.", which shall form a part of these Specifications.
• Comply with applicable requirements of OSHA. „ .
E. Conduct pre-blasting surveys and keep accurate logs of each detonation.
Make logs available to the Engineeer..
F. Design the blasting procedure including delays so that vibrating velocities
measured along the property line do not exceed 1.0 inch per second except
along the east^ side of the Site (West Yard Building) where the vibration
velocities are limited to 0.5 inch per second. In no Case Shall the peak
particle velocity exceed 2.0 inches per second at the pipe or structure
nearest to the blast site. The design of the blasting procedure shall be
based upon trial detonations made in areas designated by the Engineer. The
results of these detonations shall be monitored by a seismologist engaged by
the Authority. Vibration velocities in the existing Amtrak North River
Tunnels shall, not exceed the ambient levels caused by the simultaneous
passage of a train in each tunnel, and in no case shall peak particle
velocity exceed 1 inch per second.
Contract 02220-8 Excavation and
1-02-21064-0-0 Backfill