(c) Because of the tedious drilling necessary, line drilling is
most useful in easily drilled homogeneous rock. Despite high cost, line
drilling has application in areas where even presplitting may cause
excessive wall damage, and it may be required where other structures
were adjacent to an excavation.
(d) Qlose drilling may be specified for finished surfaces not
requiring line drilling. Close drilling consists of holes spaced farther
apart than line-drilled holes but closer than presplit holes. They may
be loaded or unloaded as specified.
d. Precautions in Approaching Final Excavation Surfaces.
(1) Precautionary measures are practiced in an effort to mini
mize damage beyond the final excavation surface. Subdrilling on berms
and final foundations should not be permitted. Some CE specifications
require that upon approaching within 15 ft above grade for a concrete
dam foundation, blastholes must not be loaded below two-thirds the
distance to grade. This in effect reduces the last two regular lifts to
10 and 5 ft (or less) and necessitates a reduction in hole spacing. Sub
sequent final trimming to grade is usually accomplished with wagon
drills or jackhammers and very light charges.
(2) Tn horizontally stratified rock, special care should be exer
cised to avoid opening a bedding surface at a comparatively shallow
depth below grade by blasting above grade. Such a surface, created
by the spalling mechanism (see para 2-3b), may be a very real but un
known hazard to the safety of a concrete dam since it postdates founda
tion exploration. The phenomenon can occur despite restrictions such
as those mentioned above.
(3) Pre split surfaces are preserved by one or more of the fol
lowing precautions taken in the main blast:
(a) The outside rows may be loaded lighter to reduce vibration
and fragmentation.
(b) Berms may be left adjacent to the presplit for later removal.
(c) The delay pattern may be arranged to progress parallel to the
presplit (Fig. 5-23) in order to avoid excessive laack pressure beyond
the presplit.
5-5. _B]a£ting_for_Contro]^_o£_R£ck_Sizes_. Heavy construction usually
requires rock for fills, aggregate, or riprap. Blasting must be de
signed to produce the proper size and grades of fragments for these
5-23