NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 1 Mar 72

(c) Because of the tedious drilling necessary, line drilling is most useful in easily drilled homogeneous rock. Despite high cost, line drilling has application in areas where even presplitting may cause excessive wall damage, and it may be required where other structures were adjacent to an excavation.

(d) Qlose drilling may be specified for finished surfaces not requiring line drilling. Close drilling consists of holes spaced farther apart than line-drilled holes but closer than presplit holes. They may be loaded or unloaded as specified.

d. Precautions in Approaching Final Excavation Surfaces.

(1) Precautionary measures are practiced in an effort to mini­ mize damage beyond the final excavation surface. Subdrilling on berms and final foundations should not be permitted. Some CE specifications require that upon approaching within 15 ft above grade for a concrete dam foundation, blastholes must not be loaded below two-thirds the distance to grade. This in effect reduces the last two regular lifts to 10 and 5 ft (or less) and necessitates a reduction in hole spacing. Sub­ sequent final trimming to grade is usually accomplished with wagon drills or jackhammers and very light charges.

(2) Tn horizontally stratified rock, special care should be exer­ cised to avoid opening a bedding surface at a comparatively shallow depth below grade by blasting above grade. Such a surface, created by the spalling mechanism (see para 2-3b), may be a very real but un­ known hazard to the safety of a concrete dam since it postdates founda­ tion exploration. The phenomenon can occur despite restrictions such as those mentioned above.

(3) Pre split surfaces are preserved by one or more of the fol­ lowing precautions taken in the main blast:

(a) The outside rows may be loaded lighter to reduce vibration and fragmentation.

(b) Berms may be left adjacent to the presplit for later removal.

(c) The delay pattern may be arranged to progress parallel to the presplit (Fig. 5-23) in order to avoid excessive laack pressure beyond the presplit.

5-5. _B]a£ting_for_Contro]^_o£_R£ck_Sizes_. Heavy construction usually requires rock for fills, aggregate, or riprap. Blasting must be de­ signed to produce the proper size and grades of fragments for these

5-23

CITY_21MC100_0 12669694

NYC-WTC_000435924

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435924Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →