Table 5-3. Some Typical Hole Spacings and Diameters,
Charge Concentrations, and Burdens for Smooth
Blasting (after Langefors and Kihlstrom^'^)
Drill Hole Charge Con Burden (thick
Diameter centration Spacing ness of berm)
in. Ib/ft ft ft
1-1/2 0.08 2 3
2 0,17 2-1/2 3-1/2
2-1/2 0.23 3-1/2 4-1/2
3 0.34 4 5-1/2
3-1/2 0.5 4-1/2 6-1/2
4 0.6 5-1/2 7
(Courte sy of Alrnqvist <£ ^iksetl ForLag AB)
hole diameter. These form a surface of weakness to which the primary
blast can break. They also reflect some of the shock waves. Increased
use of presplitting for economical reasons has relegated line drilling to
a supplementary role. Line drilling may be required prior to pre-
splitting for at least 10 ft in both directions from a 90-deg corner. In
this procedure the depth of presplit holes must not exceed that of the
line drill holes.
(b) In line drilling the primary blasting is conducted to within
two or three rows of the line-drilled row to decrease the burde.n. The
row of primary blastholes nearest the line-drilled row should have 75
percent of the usual hole spacings and should be 50 to 75 percent closer
to the line-drilled row than to the last primary row (Fig. 5-22). The
powder factor should be reduced.
EDGE OF __ O£NCH
PRIMARY BLASTHOLES
----- o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o-----
LINE-OKLLED NOLES excAVAnON line —*
Fig. 5-22. Typical arrangement of line drilling with respect to
main blastholes
5-22
CITY_21MC100_0 12669693
NYC-WTC_000435923
OCR can misread numbers and units. Confirm readings against the page image before using them.