Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 APP B 1 Mar 72

one-fourth the blast hole depth. Stemming may be required between each explosive charge in areas where the rock contains open seams, joints or faults. Pre­ split blast holes shall be detonated prior to drilling and blasting the adjacent rock except when conditions will not permit this method or when it can be demonstrated to the satisfaction of the Contracting Officer that in special cases a millisecond delay system will produce acceptable rock surfaces.

1-5. Seismic Monitoring Specifications, Milton Freewater Quarry.

3-03. BLASTING FOR QUARRY OPERATIONS.

a. General; All blasting operations shall be per­ formed in accordance with the applicable provisions of Corps of Engineers Manual EM 385-1-1 dated 13 March ' 1958, entitled “General Safety Requirements’’ and supple­ mented by North Pacific Division Supplement, dated 15 July I960. The Contractor shall furnish to the Contracting Offi­ cer prior to each blast a plan of all blast holes showing pat­ tern and depth of drilling, type of explosive used, loading pattern, and sequence of firing. This plan shall show all holes, charges and existing quarry face relative to quarry boundaries by dimensions and elevations in feet. The drilling and blasting plan is for record purposes only, and will not absolve the Contractor of his responsibility for using proper drilling and blasting procedures. If the Con­ tractor selects and operates a quarry within one mile of any residence, building or bridge subject to vibration dam­ age by blasting, the Contractor’s blasting operations shall be suljject to the requirements of paragraphs 3-03 b. and 3-03 , below.

b. Monitoring; All blasting for quarry operations that are within one mile of any residence, bridge, or building shall be monitored for each blast. No separate payment will be made for blasting or monitoring blasts in the riprap quarry, and all costs thereof shall be incidental to and in­ cluded in the applicable Item No. 7, “Riprap, Class I,’’ Item No. 8, “Riprap, Class II,’’ or Item No. 9, “Riprap, Class III.’’ For the initial blast of the quarry, the quantity of explosive shall be limited to an amount which will not cause damage to buildings, bridges, or private property in the area. When ground characteristics for any specified

B-11

CITY_21MC100_0 12669755

NYC-WTC_000435985

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435985Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →