EM 1110-2-3800
APP B
1 Mar 72
blasting location have been determined from the initial blast
by instrumentation, the allowable quantity-distance relations
between the amount of explosives used and the distance from
the blast site shall be determined from the accepted results
of instrumentation at the given operation for the various
weights of explosives. The vibration measurements at the
nearest building or dwelling shall not exceed a total Energy
Ratio of 1.0. Recordings shall be taken at all of the most
critical locations. The Energy Ratio in a single direction
shall be calculated by the following formula:
E.R. = (3.29 FA)2
where F = frequency in cycles per second
A = amplitude in inches
Total Energy Ratio is defined as arithmetical sum of Energy
Ratios in three mutually perpendicular planes of motion.
Reference: Safety Regulation No. 23, dated 20 August 1965,
State of New Jersey. Department of Labor and Industry,
Trenton, New Jersey.
c. Seismograph: The Contractor shall have a mini
mum of two approved seismograph instruments for moni
toring blasting operations (see exception, paragraph 3-03a).
Additional instruments will be required if found necessary.
Locations of instruments shall be subject to the approval of
the Contracting Officer. Seismographs for monitoring of
quarry blasting shall be placed at opposite locations. Each
seismograph instrument shall be capable of recording photo
graphically all three components of ground motion. The
recorded data shall include for each shot:
(1) Identification
* of instrument used.
(2) Name of qualified observer.
(3) Name of qualified interpreter.
(4) Distance and direction of recording station
from area of detonation.
(5) Type of ground at recording station.
B-12