NYC 9/11 Public Portal Document
EM 1110-2-3800
APP B
1 Mar 72
(3) Excavation for this contract has rdck with vertical
and latera*! variations in hardness and texture, containing
open and weathered seams, shear planes, joints and faults.
(4) Drilling and blasting shall be done only to the
depth, amount and extent and with explosives of such quality,
quantity and in such location that will neither disrupt nor
dama'ge the rock forming the prescribed limits of the
excavation. When in the opinion of the Contracting Officer,
damage is being done to the rock outside of the limits of the
excavation, it will be the Contractor’s responsibility to de
termine and use drilling and blasting methods that will pro
duce the specified results regardless of the rock conditions
encountered. Presplit Blasting shall be used to produce all
slopes in rock excavation not ripped and which are more than
10 feet deep. The presplit method of blasting is defined as the
use of an optimum quantity of explosives distributed along a
detonating cord the depth of the blast hole so as to produce
an open shear plane between closely spaced blast holes prior
to blasting the adjacent rock. This method shall be used on
all slopes steeper than 1 on 1 and shall be used the full depth
of the rock excavation. Test blasting may be used in areas
of varying slope and rock conditions. The presplit blast hole
diameter shall be at least two times the diameter of the ex
plosive cartridge. The holes shall be drilled parallel to the
slope of the designed excavation and shall have a spacing not
to exceed 30 inches but may be as close as 24 inches. Center
to center holes in areas of total confinement may be drilled
to the full depth of the excavation, however, in areas with
open faces the depth of blast holes may be limited and will
not exceed the horizontal burden. The blasting shall be
accomplished by loading the holes with string charges of
40 percent gelatin dynamite attached to a detonating cord,
so that all charges shall be uniformly spaced throughout
the length of the hole.
Charges will not exceed 1/4 pound of dyna
mite per linear foot of depth. In addition, one pound of
dynamite shall be concentrated at the bottom of the hole.
The amount of explosives in blast holes having a slope
flatter than one on one-half will be reduced progres
sively with the flattening of slope. Holes shall be
stemmed with coarse sand or free-running gravelly
sand having a maximum size of 3/8-inch. The depth of
stemming shall be kept to a minimum and shall not exceed
B-10
CITY_21MC100_0 12669754
NYC-WTC_000435984