NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 APP B 1 Mar 72

depths that Contractor demonstrates that tolerances can be maintained. Presplit surfaces shall be developed to at least three feet below the floor of a bench before the bench is blasted, except that the bottom bench shall be pre split to grade. General method of presplitting consists of drilling a line of holes spaced 24 inches (48 inches for “Spillway - Powerhouse Excavation - Rock”) apart in the prescribed plane, loading all of these holes with an optimum amount of Trimtex or approved equal explosive, and detonating with Primacord or an approved equal detonating fuse. Results will be judged by the condition of the finished surface on which shall remain at least 70% of the length of casts for each of the presplit drill holes. No presplitting shall be done in the structure area until it has been demonstrated elsewhere that the techniques proposed obtain the specified results. Outside the structure area presplit lines shall be limited to 100 feet in length for each of the various slopes until it has been demonstrated that the technique produces the specified results.

B2-11. Excavation - Structure Area, a. Sequence of Exca­ vation. Excavation shall be carried out in lifts as indicated on the drawings, and shall proceed in an upstream direction. A blasted “V” notch or stress relief slot as shown on the drawings shall be completed for each lift before drilling for primary blasting is done. Once a lift is started, it shall be carried to its final surface over its entire area before starting the next lift. Since the preservation of horizontal and vertical corners is critical, the presplitting of the pro­ tective bench shall be coordinated with the preset bolting as shown on the drawings and specified in Division B, section ROCK BOLTS, ANCHOR BARS, AND DRAPED FENCING. The 20-foot wide protective bench shall be shot after the muck from the adjacent primary blast has been removed. Rock bolting (other than preset bolts) as specified, and indi­ cated on the drawings shall be completed within 24 hours after the protective bench is blasted.

b- Overexcavation and Backfill. Over excavation because of a weakness inherent in the natural undisturbed structure of the bedrock shall be performed as directed, and the theoretical lines and grades will be adjusted ac­ cordingly. Material outside the excavation limits which are disturbed due to the fault or negligence of the Contractor or due to his failure to exercise sound engineering or

B-8

CITY_21MC100_0 12669752

NYC-WTC_000435982

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435982Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →