Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 APP B 1 Mar 72

size of production shall be limited to 20,000 cu. yds. per shot. All muck in front of any face being shot including the structure area shall have been removed before the round is fired. The use of millisecond delays is not initially re­ stricted; however, should proper fragmentation not be ob­ tained, or if overfragmentation produces excessive fines or incipient fractures in the rock to be used for “Rock Zone 2” and “Rock Zone 3,” the Contracting Officer reserves the right to prohibit the use of millisecond delays and to require the use of regular delays. Drilling equipment must be capa­ ble of efficiently drilling blast holes from 2 inches to 5 inches in diameter. The manner in which the rock breaks as excava­ tion progresses will be observed and if the specified results are not obtained, the Contractor will be required to revise his operation as necessary. The blasting operation shall not be revised without the prior approval of the Contracting Officer. The Contractor shall keep records of each blasting shot (round) including the following information: date, station and range, lift, number of holes, hole size, consecutive shot number, spacing, and depth; kind of explosive, quantity and method of loading and firing; delays; fragmentation range, and percent of grizzly fines. A copy of the records shall be furnished the Contracting Officer after each round.

b. Structures. In the structure area blasting of the 20-foot wide protective bench and the lift immediately above the bearing surface as shown on the drawings, shall be ac­ complished using blast holes (inclined with the bottom pointing 20° to 30° from the vertical in a downstream direc­ tion). No holes shall be closer than four feet to adjacent “Special Surfaces.’’ A slow velocity powder in the range of 5,500 feet per second shall be used in the angle holes. Bolting of “Special Surfaces’* and anchoring is specified in Division B, section ROCK BOLTS, ANCHOR BARS, AND DRAPED FENCING.

c. Pre splitting. All rock surfaces 1 on 1.25 or steeper and the 1 on 1.5 spillway apron slope shall be pre­ split. All rock surface slopes 1 on 3/4 or steeper shall be presplit prior to the time that horizontally adjacent material within 50 feet is drilled for blasting. Spillway apron shall be presplit lift by lift whenever the distance measured at the bottom of the lift is approximately 50 feet horizontal distance from the final surface. Depth of presplitting shall be limited to 33 feet on “Special Surfaces” elsewhere to

B-7

CITY_21MC100_0 12669751

NYC-WTC_000435981

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435981Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →