NYC 9/11 Public Portal Document
EM 1110-2-3800
APP B
1 Mar 72
blast: the sequence and pattern of delays, and description
and purpose of special methods. The loading of holes
shall be done in vne presence of a Government inspector.
Acceptance by the Contracting Officer of blasting data
will not relieve the Contractor of his responsibility to
produce satisfactory results as set forth in these speci
fications. Drilling and blasting shall be done only to the
depth, amount and at such locations, with explosives of
such quantity, distribution and density that will not pro
duce unsafe or damaged rock surfaces or damage rock
beyond the prescribed excavation limits. Excavation for
this contract has rock with vertical and lateral varia
tions in hardness and texture containing open and oxidized
seams, shear planes, joints and faults. As excavation
operations progress, the drilling and blasting procedures
shall be determined only by satisfactory results achieved,
and approved by the Contracting Officer. 'When a drilling and
blasting program results in damage to the excavation, the
Contractor will be required to devise and employ methods
which will prevent such damage. The revision may in
clude special methods such as presplit and zone blasting,
shallow lifts, reduction in size of individual blasts, small
diameter blast holes, closely spaced blast holes, reduction
of explosives, greater distribution of explosives by use of
decking and primacord or variation in density of explosives.
c. Presplit Blasting. - (1) General. - The pre split
method of blasting is defined as the use of an optimum
quantity of explosives, distributed along primacord the full
hole depth and detonated so as to produce an open shear
plane between closely spaced blast holes prior to the adja
cent primary blasting. This method shall be used for all
faces or slopes steeper than 1 on 1.
(2) Open Cut Excavation. - Presplit blast holes shall
be detonated prior to drilling and blasting of the adjacent
rock. Test blasts may be used in the areas of varying slope
and rock conditions. However, the spacing of loaded pre
split blast holes shall not exceed 24 inches center to center,
and may be as close as 12 inches. Blast holes in areas of
total confinement may be drilled to the full depth of the ex
cavation; however, in some areas with open faces the depth
of blast holes may be limited and will not exceed the hori
zontal burden. The hole diameter shall be at least two
times the diameter of the explosive cartridge. The amount
B-3
CITY_21MC100_0 12669747
NYC-WTC_000435977
OCR can misread numbers and units. Confirm readings against the page image before using them.