NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 APP B 1 Mar 72

sequence of detonating blast holes shall be such that will prevent back-pressures and damage to final faces and configuration.

3-05. EXPLOSIVES. - a. Safety. - In addition to full com­ pliance with Section XXII, Blasting, of General Safety Requirements, EM 385-1-1, dated 13 March 1958.f

b. Storage. - The Contractor shall submit to the Contracting Officer, for approval, drawings showing the location, access to and type of construction of the pro­ posed storage magazine for explosives, and cap house. The explosives storage magazine and other facilities may be located on Government lands if satisfactory locations can be found and are approved by the Contracting Officer; or the Contractor, at his option, through private negoti­ ations, may locate explosive magazines outside Govern­ ment lands. The Contractor shall provide and maintain access to the explosive storage areas at his own expense.

3-06. DRIKLINGA1ID_BLA^^ Gener^ - The drill­ ing and blasting program and methods shall be those necessary to accomplish the excavation shown on the con­ tract drawings in accordance with the procedure speci­ fied herein. Under no circumstances shall blasting be performed within 100 feet of concrete which has been placed less than seven days. Blasting within 100 feet of concrete older than seven days will be permitted only if approved by the Contracting Officer. A 50-watt, remote- controlled radio transmitting tower owned and operated by the Forest Service is located near the auxiliary dam as indicated on the drawings. Necessary precautions to avoid a premature blast due to operation of the trans­ mitter shall be taken by the Contractor.

b. Blasting. - Prior to drilling for each blast, unless excepted by the Contracting Officer, the Contrac­ tor shall submit on an approved form the pertinent data on the location, depth and area of the blast; diameter, spacing, depth, over depth, pattern and inclination of blast holes; the type, strength, amount, distribution and powder factor for the explosives used per hole and per

t The manual has subsequently been revised and issued 1 Mar 1967.

B-2

CITY_21MC100_0 12669746

NYC-WTC_000435976

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435976Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →