NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 APP B 1 Mar 72

of explosives in blast holes having a slope flatter than one on one-third shall be reduced progressively with the flattening of slope. The depth of stemming above the explo­ sive will be kept to a minimum and shall not exceed one- fourth of blast hole depth. Stemming may be required between each explosive charge in areas where rock contains open, weathered, or clay-filled seams, joints or faults.

d. Structures. - Excavation of slopes, faces and shapes in the foundation for structures may necessitate, in addition to presplit blasting, the use of full hole decking, limitation on the depth of blast holes, and a limitation on the width of blast area adjacent to final surfaces to prevent structural damage to rock beyond the excavation lines. The method and type of blast hole decking and hole spacing will be determined by results which are satisfactory to the Con­ tracting Officer.

Berms, Benches, Faces and Structural Forms. - Where a berm, bench or other horizontal surface superim­ poses a vertical or sloped surface, excavation to line and grade of the horizontal surface shall be completed prior to starting excavation of the vertical or sloped surfaces in order to prevent loss of the berm shoulder or damage to the underlying rock face. Blast holes shall not be drilled to a depth greater than 2 feet below- the design grade of a berm. Drilling and blasting lift depths in confined shapes or fea­ tures shall be limited from one-half to two-thirds the exca­ vation width unless otherwise approved by the Contracting Officer.

f. Final Grades and Excavation Lines. - When exca­ vation has progressed to within 15 feet of the final grade or lines of required excavation against which concrete is to be placed, drilling and blasting shall be limited to two-thirds of the remaining depth of excavation except that when 5 feet or less of rock remains to be excavated, blasting may be permitted to final grade if it can be demonstrated that no damage will result to the foundation. Blast holes larger than 3-1/2 inches in diameter shall not be drilled closer than 5 feet to a horizontal or near horizontal grade or within 15 feet of a vertical or near vertical face. Whenever, in the opinion of the Contracting Officer, further blasting may in­ jure the rock upon or against which concrete is to be placed, the use of explosives sl^ll be discontinued and the excavation

B-4

CITY_21MC100_0 12669748

NYC-WTC_000435978

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435978Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →