EM 1110-2-3800
APP B
1 Mar 72
shall be completed by hand methods and/or pneumatic tools,
by wedging, barring, picking or other approved methods
exclusive of explosives.
1-3. Blasting Specification for Structure Area (in Limestone), Stockton
Dam.
SECTION B2. EXCAVATION
B2-05. Spillway-Powerhouse Area Excavation, a. General.
(1) Spillway-powerhouse area is identified as the areas
which are prepared for the concrete structure and includes
the approach and outlet channel.
(2) Structure area is identified as that portion of
the spillway-powerhouse area from dam station 99+84 to dam
station 106+48, range 0+90 upstream to range 4+12
downstream.
B2-08. I^neSj_Grade£,,_and^_Tolerance_s. a. General. Un
less otherwise specified, all excavation shall be completed
to the lines and grades shown on the drawings.
b. “A“ and “B*’ lines as shown on the drawings
indicate the maximum and minimum limits for “Bearing
Surfaces** and “Special Surfaces.’* No material will be per
mitted to remain inside the “A** lines.
c. Tolerances. (1) “Special Surfaces*’ are pre-
split rock surfaces (except 1 on 1.5 spillway apron slope)
against which concrete is to be placed. The tolerances are
the “A” lines to “B** lines.
(2) “Bearing Surfaces** are all surfaces under con
crete structures which are not defined as “Special Surfaces.”
Tolerances are the “A** lines to “B** lines.
(3) Pre split Surfaces (Other than *‘Special Sur
faces**) . Tolerances from the surfaces shown on the
drawings shall not exceed three feet measured horizon
tally, however, the maximum horizontal tolerance between
adjacent presplit holes shall not exceed twelve inches.
B-5