EM 1110-2-3800
1 Mar 72
Clause 12—Permits and Responsibilities
Clause 14 —Other Contracts
Clause 23—Contractor Inspection System
Clause 32 —Site Investigations
Clause 34 —Operations and Storage
Clause 39 —Additional Definitions
Clause 40—Accident Prevention
Clause 41 —Government Inspection
Clause 50—Value Engineering
Clause 62—Variations in Estimated Quantities
Special Provisions
Physical Data
Variation in Estimated Quantities —Subdivided Items
Layout of Work
Quantity Surveys
Damage to Work
Approved Material Sources
Payment
Authorized Representative of Contracting Officer
Contractor Quality Control
c. Geologic Data. Data developed from geologic investigations
affect the design, preparation of plans and specifications, and the
pricing placed on the required rock excavation by the contractors in
bidding the work. The responsibility for presenting an accurate
description of materials to be excavated rests with the Government.
EM 1110-1-1801 and EM 1110-1-1806 should be consulted in this
regard.
d. Review Plans for Practicality of Excavation Outlines. During
preparation of plans and specifications, the design should be reviewed
for the practicality and the degree of difficulty in obtaining the various
excavation outlines. These should be considered as to the possibility of
attainment compared with their probable cost. For example, exterior
vertical corners at right angles may be eliminated and replaced by
battered corners.
e. Construction Inspection To Be Expected. Reference should
be made to paragraphs 2-27 and 103-03(d) in EP 415-1-261.
f. Blast Records. The specifications should require the contrac
tor to furnish the Contracting Officer complete information on every
blast. Where a proposed general blasting plan is required prior to the
start of blasting, the individual blast reports may be submitted after