NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 1 Mar 72

Clause 12—Permits and Responsibilities Clause 14 —Other Contracts Clause 23—Contractor Inspection System Clause 32 —Site Investigations Clause 34 —Operations and Storage Clause 39 —Additional Definitions Clause 40—Accident Prevention Clause 41 —Government Inspection Clause 50—Value Engineering Clause 62—Variations in Estimated Quantities

Special Provisions

Physical Data Variation in Estimated Quantities —Subdivided Items Layout of Work Quantity Surveys Damage to Work Approved Material Sources Payment Authorized Representative of Contracting Officer Contractor Quality Control

c. Geologic Data. Data developed from geologic investigations affect the design, preparation of plans and specifications, and the pricing placed on the required rock excavation by the contractors in bidding the work. The responsibility for presenting an accurate description of materials to be excavated rests with the Government. EM 1110-1-1801 and EM 1110-1-1806 should be consulted in this regard.

d. Review Plans for Practicality of Excavation Outlines. During preparation of plans and specifications, the design should be reviewed for the practicality and the degree of difficulty in obtaining the various excavation outlines. These should be considered as to the possibility of attainment compared with their probable cost. For example, exterior vertical corners at right angles may be eliminated and replaced by battered corners.

e. Construction Inspection To Be Expected. Reference should be made to paragraphs 2-27 and 103-03(d) in EP 415-1-261.

f. Blast Records. The specifications should require the contrac­ tor to furnish the Contracting Officer complete information on every blast. Where a proposed general blasting plan is required prior to the start of blasting, the individual blast reports may be submitted after

8-3

CITY_21MC100_012669734

NYC-WTC_000435964

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435964Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →