NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 1 Mar 72

contractor as far as practicable in bidding on Federal contracts. This is done in the effort to secure the most competitive bidding by reducing the contractor’s need to add a contingency item for possible costs not specifically anticipated. There is evidence from CE projects that this approach is applicable to specifications regarding blasting. When there is sufficient knowledge from previous work and from geologic data to determine that certain blasting techniques, procedures, or limi­ tations will probably be necessary to complete the work, this informa­ tion should be included in the plans or specifications in some manner. Where it is essential that the final lines be obtained with close toler­ ances and the rock be undisturbed, the plans and specifications should outline in detail such requirements so the bidders can estimate accord­ ingly. There is somewhat of a precedent to this approach in that the CE practice for Civil Works construction requires compaction of em­ bankments on the basis of specified compaction procedures and mois­ ture control, rather than on the basis of a required end product.

8-2. Considerations in Preparation of Plans and Specifications.

a. Stated_JPrinci£les_o£_Pians_ajid_S£ecifications. A general principle applicable to all CE contract plans and specifications is that they will be carefully prepared to eliminate all conditions or practices that might operate to delay the work or that might result in controversy (see ER 1110-2-1200, para 7a). Further, specifications should be so clear and complete that any competent manufacturer or construction firm should experience no undue difficulty in preparing bids or esti­ mates. Questions that may arise during performance of the contract should be resolvable by reference to the contract, of which the speci­ fications form a part (see ER 1110-2-1200, para 7d).

b. Pertinent General and Special Provisions. As rock excavation is not covered by guide specifications, recently approved and success­ ful project specifications or sections thereof may be used as guides to the extent they are applicable. All technical provisions are subordinate, first, to the General Provisions and, second, to the Special Provisions of the general contract. The following is a list of those provisions that are deemed most pertinent to rock excavation; they should be reviewed and kept in mind during the preparation of plans and specifications.

General Provisions

Clause 2—Specifications and Drawings Clause 3“ Changes Clause 4—Changed Conditions Clause 6—Disputes Clause 9.b,—Materials and Workmanship

8-2

CITY_21MC100_0 12669733

NYC-WTC_000435963

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435963Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →