NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 145 pages

Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 1 Mar 72

the blast. On other projects, proposed blast data have, been required before drilling commences on each blast with a final report required after the shot is fired. Information should include location of blast by station and range; elevation of top of blast: depth, spacing, burden, number, and diameter of holes: type and quantities of explosives: quantities of detonating cord used; quantities and delay periods of electrical caps; maximum quantity of explosive detonated in a single delay period; a sketch of drill-hole pattern; number of cubic yards blasted; and powder factor. Fig. 8-1 shows one type of form pro­ vided to contractors by the Associated General Contractors of America, Inc. Fig. 8-2 illustrates a sample of a blast report form.

g. Sequence of Operations. Where there are technical rea­ sons for excavation to proceed in a particular sequence, this re­ quirement should be clearly defined in either the plans or specifications.

h. Specifying Methods—Obtaining Sound Walls. Where experience and geologic data indicate that a method such as presplitting is neces­ sary to obtain the desired results, specify the method, or methods if an option can be given- Each method should be described in sufficient detail so that no item is omitted that might prove to be essential for its success. Allow enough latitude that the method can be adjusted to the field conditions and to contractor's proposals. Any contractor's pro­ posal shall be described in detail and demonstrated to give equal and satisfactory results. When specifying presplitting, it is well to keep in mind that in some rocks, right-angle, outside corners of excavations are not too successfully obtained. Provisions for line drilling outside corners should be considered. Locally the burden in front of the pre- split wall will need to be blasted in small shots to a free face.

i. Obtaining Final Grade. The use of angle holes and limitation on the depth of a final lift should be considered if they will be helpful in obtaining the final grade without damaging the underlying rock.

j. S_£ecif;^ing_and^_Prohibit2Jig_Certain_Prajctice^ It is sometimes beneficial to provide in the specification for the use of such measures as deck-loaded and small-diameter holes that may be deemed neces­ sary later. Undesirable practices, such as subdrilling below specified tolerances in structural excavations, should also be prohibited.

k. Requiring Gradation Ranges in Blasted Rock. When blasting results are desired to produce certain fragmentation, test blasting should be performed by the contractor to demonstrate that he will pro­ duce the desired product. In certain rock types there is often

8-4.

CITY_21MC100_0 12669735

NYC-WTC_000435965

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435965Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →