the blast. On other projects, proposed blast data have, been required
before drilling commences on each blast with a final report required
after the shot is fired. Information should include location of blast
by station and range; elevation of top of blast: depth, spacing, burden,
number, and diameter of holes: type and quantities of explosives:
quantities of detonating cord used; quantities and delay periods of
electrical caps; maximum quantity of explosive detonated in a single
delay period; a sketch of drill-hole pattern; number of cubic yards
blasted; and powder factor. Fig. 8-1 shows one type of form pro
vided to contractors by the Associated General Contractors of
America, Inc. Fig. 8-2 illustrates a sample of a blast report
form.
g. Sequence of Operations. Where there are technical rea
sons for excavation to proceed in a particular sequence, this re
quirement should be clearly defined in either the plans or
specifications.
h. Specifying Methods—Obtaining Sound Walls. Where experience
and geologic data indicate that a method such as presplitting is neces
sary to obtain the desired results, specify the method, or methods if an
option can be given- Each method should be described in sufficient
detail so that no item is omitted that might prove to be essential for its
success. Allow enough latitude that the method can be adjusted to the
field conditions and to contractor's proposals. Any contractor's pro
posal shall be described in detail and demonstrated to give equal and
satisfactory results. When specifying presplitting, it is well to keep in
mind that in some rocks, right-angle, outside corners of excavations
are not too successfully obtained. Provisions for line drilling outside
corners should be considered. Locally the burden in front of the pre-
split wall will need to be blasted in small shots to a free face.
i. Obtaining Final Grade. The use of angle holes and limitation
on the depth of a final lift should be considered if they will be helpful
in obtaining the final grade without damaging the underlying rock.
j. S_£ecif;^ing_and^_Prohibit2Jig_Certain_Prajctice^ It is sometimes
beneficial to provide in the specification for the use of such measures
as deck-loaded and small-diameter holes that may be deemed neces
sary later. Undesirable practices, such as subdrilling below specified
tolerances in structural excavations, should also be prohibited.
k. Requiring Gradation Ranges in Blasted Rock. When blasting
results are desired to produce certain fragmentation, test blasting
should be performed by the contractor to demonstrate that he will pro
duce the desired product. In certain rock types there is often
8-4.