NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Subchapter C

Reporting and Filing Requirements, Plans and Fees

§1-21 Notifications, Reports, Plans, and Fees §1-22 Permits §1-23 Aiterations/Renovations/Modifications §1-24 Projects Requiring NYC Buildings Department Plan Amendment §1-25 Projects Not Requiring Any Buildings Department Plan Approvals or Permits §1-26 Emergency Asbestos Project Notification §1-27 Record Keeping Requirements for Investigators

§1-21 Notifications, Reports, Plans, and Fees, (a) For the purpose of determining whether there has been compliance with any reporting or filing requirement established in §§1-22 through 1-26, the size and scope of the overall project shall control, with particular reference to the total amount of friable asbestos-containing material which will be disturbed. Such require­ ments may not lawfully be avoided or lessened through the performance of work in incremental or piecemeal fashion. (b) When alternative calculations (i.e., linear feet and square feet) of the size and scope of an asbestos project result in that project coming within the definition of more than one sub-classification of asbestos project, the calcula­ tion with the higher absolute number shall determine the sub-classification of asbestos project procedures to be followed. (c) For the purpose of §§1-21 through 1-26, the term “work” shall be understood as in the common construction usage, i.e. not specifically related to asbestos-abatement activities. §1-22 Permits, (a) This section shall apply to applications for the fol­ lowing NYC Department of Buildings permits; (1) Demolition permits, except that the provisions of this section shall not apply to the demolition of a one-story garage with a 2-car maximum capacity which is not supplied with water lines, or to the legalization of demolition work which occurred prior to April 1, 1987. (2) Plumbing permits, except that applications for alteration and repair slips shall be subject to the provisions of this section only when such applications are for the installation, alteration, or removal of fuel-burning equipment.

5731 RCNY 5-31-98

CITY_21MC100_006242952

NYC-WTC_000411821

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411821Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →