NYC 9/11 Public Portal Document
Asbestos Abatement
Inc., P.O. Box 1441, Minneapolis, MN 55440-1444.
J. Brushes: All brushes shall have nylon bristles. Wire brushes are excluded from
use due to their potential to shred asbestos fibers into small, fine fibers. Wire
brushes maybe used for cleaning pipe joints within glove-bags upon written
approval of the Resident Engineer.
K. Hand Power Tools: shall be equipped with HEPA-filtered local exhaust
ventilation if used to drill, cut into or otherwise disturb ACM.
L. Other Tools and Equipment: Contractor shall provide other suitable tools for the
stripping, removal, encapsulation, and disposal activities including but not limited
to: hand-held scrapers, sponges, rounded-edge shovels, brooms, and carts.
M. Eans and Eeaf Blower: Provide Eeaf Blower (one leaf blower per floor) and one
20-inch diameter fans for each 10,000 cubic feet of Work Area volume to be used
for aggressive sampling technique for clearance air testing.
N. Fire Extinguishers: Provide type "A" fire extinguishers for temporary offices and
similar spaces where there is minimal danger of electrical or grease-oil-flammable
liquid fires. In other areas, provide type "ABC" dry chemical extinguishers of
NFPA recommended types for the exposure in each case. All fire extinguishers
shall comply with the applicable recommendations of NFPA Standard 10,
"Standard For Portable Extinguishers." Provide a minimum of four fire
extinguishers in each Work Area; one in the equipment room of the
decontamination unit, one outside the Work Area in the clean room or directly
outside same, and two fire extinguishers where they are most effective for their
intended purpose. Do not exceed seventy-five feet between fire extinguishers
within the Work Area.
O. First Aid Kits: Contractor shall maintain adequately stocked first aid kits in the
clean rooms of the decontamination units and within Work Areas. The first aid kit
shall be approved by a licensed physician for the work to be performed under this
Contract.
P. Water Service:
1. Temporary Water Service Connection: All connections to the Eacilities
water system shall include back flow protection. Valves shall be
temperature and pressure rated for operation of the temperature and
pressures encountered. After completion of use, connections and fittings
shall be removed without damage or alteration to existing water piping,
and equipment. Eeaking or dripping fittings/valves shall be repaired and or
replaced as required.
2. Water Hoses: Employ new heavy-duty abrasion-resistant hoses with a
CAPITAL PROJECT NUMBER PO79201K 02081-50
100: CONTRACT DOCUMENTS REV. May 3,2000
- 50 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_0 06631299
NYC-WTC_000416811
OCR can misread numbers and units. Confirm readings against the page image before using them.