NYC 9/11 Public Portal Document
a
LARGE ASBESTOS PROJECT
(SMALL ASBESTOS PROJECT OPTION)
WORKER DECONTAMINATION ENCLOSURE SYSTEM
WORKER
I
1. Enters clean room
2. Removes clothing, places in locker
3. Puts on nylon swim suit (optional)
4. Puls on clean coveralls
5. II separate disposable loot coverings
J
WORKER
10. Puls on any additional
clothing - deck shoes, hard hat, etc.
are used, these are put on
6. Applies tape around anWos, wrists, etc. §
7. Inspects respirator, puts it on, checks lit
I
11. Collects necessary tools. 8. Puts on hood over respirator headstraps
Proceeds to work area. 9. Proceeds Io equipment room
I DECONTAMINATION AFEA
II---- w M
J
/
tn
i
WORKAREA
WORKER
EQUIPMENT
ROOM I
<
SHOWER
o
i CLEAN
ROOM
12. Brushes oft
coniaminatlon
or jljM JI___ ft
HERA vacuums
I WORKER
13. Removes all clothing
except respirator
14. Places disposable
broloctlve clothing
In a bag or bln
WORKER
17. Washes respirator
and soaks tillers
(without removing,
/ WORKER
/__ 21, Dries oft, dresses In clean
coveralls or street clothes
22. Cleans and dries respirator,
replaces lifter (It applicable,
15. Stores any other 18. Removes respirator
s
CM
contaminated articles washes with soap and waler
16. Proceeds to shower 19. Washes swimsuit
20. Thoroughly washes body
I and hair
s CURTAIN DOOR €0>
o
g ILLUSTRATION I
n
K
ro
S
o
o
o
o
o
to
CO
NYC-WTC_000411853
OCR can misread numbers and units. Confirm readings against the page image before using them.