Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
§1-91 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION
(2) the decontamination systems shall be sealed airtight after the evacu
ation of workers and/or authorized visitors from the work area, and
(3) all adj acent areas shall be monitored for asbestos fiber concentration
upon discoveiy of, and subsequently throughout, the power failure.
(g) Negative pressure ventilation equipment shall be installed and oper
ated to provide at least one air change in the work area every 15 minutes,
except during clearance air monitoring when at least one air change in the
work area every 30 minutes shall be provided.
(continued')
5842 RCNY 5-31-98
1..
CITy_21MC100_0 06242983
NYC-WTC_000411852
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000411852Source: NYC Law Department, mirrored locally
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.