NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Parts Work Place Procedures

§1-91 Engineering Controls §1-92 Work Place Entry and Exit Procedures §1-93 Equipment and Waste Container Decontamination and Removal Procedures §1-94 Maintenance of Decontamination Enclosure Systems and Barriers

§1-91 Engineering Controls. The following procedures shall be followed during the conduct of abatement activities on large asbestos projects: (a) All large asbestos projects shall utilize negative pressure ventilation equipment. (b) The negative pressure ventilation equipment shall operate continu­ ously, 24 hours a day, from the establishment of isolation barriers through successful clearance air monitoring. If such equipment shuts off, adjacent areas shall be monitored for asbestos fibers. (c) A static negative air pressure of 0.02 inches (minimum) water column shall be maintained at all times in the work place during abatement to ensure that contaminated air in the work area does not filter back to uncontaminated areas. (d) If more than one ventilation unit is installed, units shall be turned on one at a time while checking the integrity of all barriers for secure attachment - and the need for additional reinforcement. (e) A dedicated power supply for the negative pressure ventilating units shall be utilized. (f) On loss of negative pressure or electric power to the negative pressure ventilating units, abatement shall stop immediately and shall not resume until power is restored and negative pressure ventilation equipment is operating again. When power failure or loss of negative pressure equipment lasts or is expected to last longer than one-half hour: (1) the make-up air inlets shall be sealed airtight, and

5841 RCNY 5-31-98

CITy_21MC100_006242982

NYC-WTC_000411851

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411851Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →