Asbestos Abatement
respirator shall be wet wiped and HEPA vacuumed thoroughly before removing
and prior to aggressive shower.
D. Following showering and drying off, each worker or authorized visitor shall
proceed directly to the clean room, dress in street clothes, and exit the
decontamination enclosure system immediately.
3.4 Personnel Entrance and Decontamination Procedures for Removal Operations
Utilizing Attached Decontamination FacilitlES
A. All workers and authorized visitors shall enter the Work Area through the worker
decontamination facility.
B. All individuals who enter the Work Area shall sign the entry log, located in the
clean room, upon each entry and exit. The log shall be permanently bound and
shall identify fully the facility, agents, contractor(s), the project, each Work Area
and worker respiratory protection employed. The site supervisor shall be
responsible for the maintenance of the log during the abatement activity.
C. Each worker or authorized visitor shall, upon entering the job site, remove street
clothes in the clean room and put on a clean respirator with filters, and clean
protective clothing before entering the Work Area through the shower room and
equipment room.
D. Each worker or authorized visitor shall, each time he leaves the Work Area,
remove gross contamination from clothing before leaving the Work Area; proceed
to the equipment room and remove clothing except the respirator; still wearing the
respirator, proceed to the shower room; clean the outside of the respirator with
soap and water while showering; remove filters, wet them, and dispose of them in
the container provided for that purpose; wash and rinse the inside of the
respirator; and thoroughly shampoo and wash himsclf'/licrself.
E. Following showering and drying off, each worker or authorized visitor shall
proceed directly to the clean room, dress in street clothes, and exit the
decontamination enclosure system immediately. Disposable clothing of the
type worn inside the Work Area is not permitted outside the Work Area.
3.5 MAINTENANCE OF DECONTAMINATION ENCLOSURE FACILITIES AND
BARRIERS
A. The following procedures shall be followed during the conduct of abatement
activities.
1. All polyethylene barriers inside the work place and partitions constmcted
to isolate the Work Area from occupied areas shall be inspected by the
asbestos handler superxusor at least twice per shift.
CAPITAL PROJECT NUMBER PO79201K 02081-60
100: CONTRACT DOCUMENTS REV. May 3,2000
- 60 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631309
NYC-WTC_000416821