NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

Full Environmental Assessment Form, SEQR (Appendix A)

Machine-extracted title · confidence 72%

SEQR Appendix A supporting data for environmental assessment process.

NYC-WTC_000411617–000411629
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

and jersey barrier dividers. The ChildrenFirst day care center is located roughly 200 feet away from the facility on Broad Street and occupies a portion of the building outside a direct line of site to the facility. As these two receptors are largely screened by South Street and the FDR Drive from the site, no noise impacts would be anticipated.

In addition, the Pier 6 facility is located within Zone 5 ofthe overall WTC Emergency Project area. The primary sources of noise at the site consist of the truck loading/unloading operations and diesel powered cranes. Additional noise may be generated from heaw/ equipment, such as grapple cranes and front end loaders, although this equipment is only used intermittently and on an as-needed basis. Likewise, operations at the Pier 6 site are considered to be part of the larger emergency operation associated with the destruction of the World Trade Center complex. These construction-related activities are temporaiy and will only extend for the duration of the debris removal activities which are anticipated to last between 24-30 months. Upon the conclusion of debris removal activities, the facility will be closed and removed from the site.

C. Zoning and Planning Information

6. Is the proposed action consistent with the recommended uses in adopted local land use plans?

The Pier 6 debris removal operation would not be consistent with current approved land use plans for the site and surrounding area. The location of the Pier 6 facility includes an area which is part of the East River Esplanade. The Pier 6 operation, however, is a temporaiy facility that will only operate for the duration of debris removal operations associated with the World Trade Center site and is not intended to be a permanent or long term facility. Upon the conclusion of debris removal activities the site would be restored to it previous condition.

1. What are the predominant land use(s) and zoning classifications within a 1/4 mile radius of proposed action?

In general, the area surrounding the Pier 6 site is comprised of a mix of land uses. The predominant land uses consist of commercial and transportation uses. Pier 6 which is located at the site contains the Wall Street or Downtown heliport which is operated by the Port Authority. Immediately west of the site is South Street and the FDR Drive, a major north-

3

CITY_21MC100_013377777

NYC-WTC_000411628

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411628Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411602

Full SEQR environmental assessment form and guidance for project significance.

Similar indexed content

Compare copies and versions →