NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

Full Environmental Assessment Form, SEQR

Machine-extracted title · confidence 72%

Full SEQR environmental assessment form and guidance for project significance.

NYC-WTC_000411602–000411616
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ATTACHMENT 2 ENVIRONMENTAL ASSESSMENT FORM NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION

PIER 25 WORLD TRADE CENTER CONSTRUCTION AND DEMOLITION DEBRIS TRANSFER STATION

A. Site Description

10. Do hunting, fishing or shellfishing opportunities presently exist in the project area?

Recreational fishing opportunities are available at the site from the shoreline. These opportunities would be precluded in the immediate vicinity of the Pier 25 operation due to debris removal operations. However, dredging activities that were recently completed at the site under a separate permit have previously impacted aquatic resources at and in the vicinity of the site. Fishing opportunities would continue to be available north of the Pier 25 facility. Upon the completion of debris removal operations from the World Trade Center, the area would be restored to its pre-existing condition and these fishing opportunities would be available again at the site.

13. Is the project site presently used by the community or neighborhood as an open space or recreation area?

The site of the Pier 25 construction and demolition debris transfer station is located within an area that was previously utilized as an open space and/or recreational area for the surrounding residential communities to the east and south of the site. The location of the transfer station was part of the proposed Route 9A improvements and Hudson River Park initiative that included the development of a bikeway and pedestrian walkway in this area. This area, although under active construction prior to the events of September 11 as pah; of the development of these public resources, was used by the local community. Full development of the bikeway and pedestrian walkways were, however, not completed prior to September 11.

The development of the Pier 25 facility has resulted in the temporary loss of this area as an open space and recreational area. The Pier 25 facility, however, is considered a temporary

1

CITY_21MC1OO_O13377743 NYC-WTC_000411611

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411611Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411617

SEQR Appendix A supporting data for environmental assessment process.

Similar indexed content

Compare copies and versions →