NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

Full Environmental Assessment Form, SEQR

Machine-extracted title · confidence 72%

Full SEQR environmental assessment form and guidance for project significance.

NYC-WTC_000411602–000411616
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

facility developed as a direct result of the destruction of the World Trade Center. Upon the completion of debris removal operations, the site would be restored to its previous condition and the development of the bikeway and pedestrian walkway would be completed as originally envisioned as part of the Route 9A and Hudson River Park plans.

14. Does the present site include scenic views known to be important to the community?

The location of the Pier 25 transfer station is within an area with scenic vistas of the Hudson River and the New Jersey shoreline. Views to the Upper Bay from the site are limited by commercial, institutional and residential facilities within Battery Park City to the south. The transfer station operations will limit views from the immediate vicinity of the site. Vie w corridors are available from North Moore Street along the northern edge of the site and Harrison Street. Views from Harrison Street, however, are limited by an overpass at the Westside Highway associated with the Borough of Manhattan Community College.

The Pier 25 operations are considered a temporary action that will extend until the debris removal operations within the World Trade Center site are completed. The Pier 25 facilities will not result in long lasting or permanent impacts to the previously existing visual resources. Upon the conclusion ofall debris removal actions, the facility would be removed from the site and the scenic views would be restored to their condition prior to September 11.

16. Lakes, ponds, wetland areas within or contiguous to project areas:

The Pier 25 facility is a water-based operation that receives construction and demolition debris for offloading from an adjacent upland area. Offloading equipment consists of two barge-mounted cranes and a spud barge that are moored at the site and various cargo barges provided by the Department of Sanitation or contractors to the City for the removal of debris and steel. The Hudson River at and in the vicinity of the project is mapped by the New York State Department of Environmental Conservation as a designated tidal wetland, specifically littoral zone. Wetland impacts associated with the Pier 25 marine-based operation, however, would not be anticipated to be significant.

As part of the emergency authorization process to establish the facility in mid-September, permits were received by the City of New York to conduct required dredging within the footprint of the marine-based operation. These operations were completed in late September

2

CITY_21MC100_0 13377744 NYC-WTC_000411612

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411612Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411617

SEQR Appendix A supporting data for environmental assessment process.

Similar indexed content

Compare copies and versions →