NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

Full Environmental Assessment Form, SEQR (Appendix A)

Machine-extracted title · confidence 72%

SEQR Appendix A supporting data for environmental assessment process.

NYC-WTC_000411617–000411629
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ATTACHMENT 2 ENVIRONMENTAL ASSESSMENT FORM NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION

PIER 6 WORLD TRADE CENTER CONSTRUCTION AND DEMOLITION DEBRIS TRANSFER STATION

A. Site Description

10. Do hunting, fishing or shellfishing opportunities presently exist in the project area?

Recreational fishing opportunities are available at the site from the shoreline. These opportunities would be precluded in the immediate vicinity of the Pier 6 operation due to debris removal operations. Fishing opportunities would continue to be available north and south of the Pier 6 facility. Upon the completion of debris removal operations from the World Trade Center, the area would be restored to its pre-existing condition and these fishing opportunities would be available again at the site.

14. Does the present site include scenic views known to be important to the community?

The location of the Pier 6 transfer station is within an area with scenic vistas of the East River. Views to the Lower Bay are limited by transportation facilities to the south. The transfer station operations will limit views from the immediate vicinity of the site. The Pier 6 operations, however, are considered a temporary action that will extend until the debris removal operations within the World Trade Center site are completed. The Pier 6 facilities will not result in long lasting or permanent impacts to the previously existing visual resources. Upon the conclusion of all debris removal actions, the facility would be removed from the site and the scenic views would be restored to their condition prior to September 11.

16. Lakes, ponds, wetland areas within or contiguous to project areas:

The Pier 6 facility is a water-based operation that receives construction and demolition debris for offloading from an adj acent upland area. Offloading equipment consists of two barge­ mounted cranes that are moored at the site and various cargo barges provided by the

1

CITY_21MC100_0 13377775

NYC-WTC_000411626

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411626Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411602

Full SEQR environmental assessment form and guidance for project significance.

Similar indexed content

Compare copies and versions →