NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

Full Environmental Assessment Form, SEQR

Machine-extracted title · confidence 72%

Full SEQR environmental assessment form and guidance for project significance.

NYC-WTC_000411602–000411616
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2001. Any impacts to aquatic resources at the site, therefore, would have occurred as part ofthe dredging operations which have been previously completed. The mooring of offloading barges (i.e., crane barges) for up to two and a half years as part of the removal actions could result in impacts to aquatic resources related to the shadowing of waters adjacent to the project site. However, due to the recent dredging and the relatively slow rate of recolonization that would be typically anticipated within the substrates at the site, the mooring of these barges would not be anticipated to result in any additional impacts to aquatic resources. In addition, the facility is considered a temporary action that would continue only as long as debris removal actions from the WTC are underway, therefore long term impacts to aquatic resources would not occur.

Potential impacts associated with the loss of materials during the loading of barges are also expected to be minimal. All loading operations are conducted in a manner to minimize or eliminate loss of materials into adjacent waters. The debris removal operations also involve little or no floatable material, as this is largely removed at the World Trade Center site. As part of the proposed operation of the Pier 25 transfer station operation, however, a detailed bathymetric survey of the facility site will be conducted upon the conclusion of operations. This survey would encompass the area occupied by the stationary barge-mounted cranes, as well as, mobile cargo barges. This survey will be compared to post-dredging surveys conducted in late September to determine if any significant accumulations of material are identified. If areas are identified these would be further investigated and, if applicable, apian to mitigate these areas will be developed in conjunction with the City of New York and the Contractor.

B. Project Description

20. Will the project produce operating noise exceeding the local ambient noise levels?

The Pier 25 transfer station will require the use of heavy construction equipment for offloading operations and trucks for the transport of construction debris and steel to the facility from the World Trade Center site. These operations may result in temporary, construction-related noise impacts. Trucks from the World Trade Center site would travel north along the West Side Highway, an existing New York City Department of Transportation designated truck route to the Pier 25 facility.

3

CITY_21MC100_0 13377745

NYC-WTC_000411613

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411613Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411617

SEQR Appendix A supporting data for environmental assessment process.

Similar indexed content

Compare copies and versions →